LNER at Stevenage
How this operator is doing here
LNER had 22,003 scheduled stops at Stevenage in the 13 periods to Period 7 of 2026-27, 17% of the station's total. 65.9% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
LNER trains at Stevenage also serve Welwyn Garden City (11.2 km south, – on time, – cancelled), Potters Bar (22.8 km south, – on time, – cancelled), Sandy (25.3 km north, – on time, – cancelled), Bedford (32.0 km north-west, – on time, – cancelled), Alexandra Palace (34.3 km south, – on time, – cancelled) and London Kings Cross (41.5 km south, 75.6% on time, 3.2% cancelled), which are the stations on its network closest to Stevenage.
The busiest LNER station within 30 km of Stevenage is Sandy, 25.3 km north, with about 0 scheduled stops a day.
Of the 3 operators with enough records at Stevenage, LNER is the least punctual, at 65.9%.
For LNER, Stevenage is the 19th best of 35 ranked stations. Its 65.9% here is 1.7 percentage points below the 67.6% across the whole network.
LNER at Stevenage has slipped a little, from 69.3% within three minutes in the previous 13 periods to 65.9% in the latest 13, a fall of 3.4 percentage points. Cancellations rose to 3.3% of scheduled stops from 2.3%, which is 1.0 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,790 | 66.2% | 1.6% |
| Period 6 of 2026-27 | 1,725 | 58.8% | 5.0% |
| Period 5 of 2026-27 | 1,781 | 57.8% | 4.9% |
| Period 4 of 2026-27 | 1,793 | 64.0% | 2.4% |
| Period 3 of 2026-27 | 1,782 | 63.5% | 3.4% |
| Period 2 of 2026-27 | 1,760 | 64.7% | 3.7% |
| Period 1 of 2026-27 | 2,052 | 66.2% | 4.9% |
| Period 13 of 2025-26 | 1,825 | 73.5% | 2.2% |
| Period 12 of 2025-26 | 1,374 | 66.1% | 1.6% |
| Period 11 of 2025-26 | 1,618 | 68.4% | 3.5% |
| Period 10 of 2025-26 | 1,501 | 68.6% | 2.1% |
| Period 9 of 2025-26 | 1,456 | 67.2% | 4.9% |
| Period 8 of 2025-26 | 1,546 | 72.3% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stevenage
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 103,894 | 80.7% | 6.1% |
| Lumo (East Coast) | 3,117 | 67.0% | 1.3% |
| Hull Trains | 63 | – | – |
| Grand Central | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out