Cambridge
CBGEast of EnglandManaged by Greater Anglia
How this station is performing
Cambridge had 132,053 scheduled stops to Period 7 of 2026-27, about 363 a day. 75.8% of recorded arrivals were within three minutes of the timetable and 5.6% of scheduled stops were cancelled.
Cambridge opened on 30 July 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cambridge is the oldest; the next oldest, Shelford (Cambs), dates from 1845.
The nearest stations to Cambridge are Cambridge North (3.6 km north-east), Shelford (Cambs) (5.0 km south), Waterbeach (8.6 km north-east), Foxton (10.0 km south-west) and Whittlesford Parkway (10.3 km south). 3 stations lie within 10 km in all. Of the five, Shelford (Cambs) is the most punctual at 87.7% and Foxton the least at 66.8%, with Cambridge on 75.8%.
Cambridge is one of 3 stations named after a big city called Cambridge, home to about 123,867 people; this one stands 1.9 km from its centre.
3 operators call at Cambridge: GTR (68.5%, 48% of stops), Greater Anglia (86.1%, 42% of stops) and CrossCountry (65.6%, 10% of stops). The operator you travel with matters: Greater Anglia reaches 86.1% within three minutes while CrossCountry manages 65.6%, a gap of 20.5 percentage points.
2 of 3 stations of a similar size in East of England are more punctual than Cambridge on 75.8%. The comparison group includes Stevenage (77.7%), St Albans City (72.2%) and Watford Junction (81.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 64,016 | 68.5% | 8.4% |
| Greater Anglia | 55,173 | 86.1% | 2.5% |
| CrossCountry | 12,864 | 65.6% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Cambridge? Delay Repay
These operators call at Cambridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,533 | 65.1% | 4.5% |
| Period 6 of 2026-27 | 10,541 | 68.6% | 9.5% |
| Period 5 of 2026-27 | 10,373 | 70.9% | 6.6% |
| Period 4 of 2026-27 | 10,359 | 66.2% | 10.5% |
| Period 3 of 2026-27 | 10,332 | 77.1% | 6.0% |
| Period 2 of 2026-27 | 10,051 | 79.6% | 5.2% |
| Period 1 of 2026-27 | 11,571 | 83.4% | 4.8% |
| Period 13 of 2025-26 | 11,271 | 81.3% | 3.4% |
| Period 12 of 2025-26 | 10,161 | 82.6% | 4.6% |
| Period 11 of 2025-26 | 9,904 | 78.5% | 3.1% |
| Period 10 of 2025-26 | 6,532 | 76.0% | 4.1% |
| Period 9 of 2025-26 | 10,192 | 76.6% | 5.5% |
| Period 8 of 2025-26 | 10,233 | 78.2% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stevenage | 129,081 | 77.7% | 5.5% |
| St Albans City | 119,860 | 72.2% | 5.3% |
| Watford Junction | 153,663 | 81.5% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out