Lumo (East Coast) at Stevenage
All trains at StevenageLumo (East Coast) across BritainEast of England
How this operator is doing here
Lumo (East Coast) had 3,117 scheduled stops at Stevenage in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 67.0% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Lumo (East Coast) trains at Stevenage also serve London Kings Cross (41.5 km south, 73.3% on time, 1.2% cancelled), Peterborough (74.9 km north, – on time, – cancelled), Doncaster (190.8 km north, – on time, – cancelled), York (236.2 km north, – on time, – cancelled), Newcastle (353.5 km north, 58.8% on time, 1.0% cancelled) and Morpeth (375.4 km north, 57.8% on time, 1.0% cancelled), which are the stations on its network closest to Stevenage.
Lumo (East Coast) ranks 2nd of the 3 operators with enough records at Stevenage, on 67.0%.
For Lumo (East Coast), Stevenage ranks 6th of 8 stations and is typical: 67.0% here against 66.7% across the network, a difference of 0.3 percentage points.
Lumo (East Coast) at Stevenage improved sharply over the past year. In the latest 13 periods 67.0% of stops came within three minutes of the timetable, up 5.4 percentage points from 61.6% in the 13 before. Cancellations held steady at 1.3% of scheduled stops, against 0.9% before.
Period by period
See how Lumo (East Coast) Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 281 | 72.6% | 1.4% |
| Period 6 of 2026-27 | 271 | 61.3% | 0.7% |
| Period 5 of 2026-27 | 285 | 64.3% | 1.8% |
| Period 4 of 2026-27 | 288 | 68.1% | 0.0% |
| Period 3 of 2026-27 | 284 | 67.1% | 1.4% |
| Period 2 of 2026-27 | 230 | 64.6% | 0.4% |
| Period 1 of 2026-27 | 316 | 67.1% | 1.9% |
| Period 13 of 2025-26 | 229 | 68.0% | 3.1% |
| Period 12 of 2025-26 | 219 | 76.6% | 2.3% |
| Period 11 of 2025-26 | 265 | 71.5% | 0.8% |
| Period 10 of 2025-26 | 225 | 70.0% | 0.9% |
| Period 9 of 2025-26 | 112 | 48.6% | 2.7% |
| Period 8 of 2025-26 | 112 | 57.1% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stevenage
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 103,894 | 80.7% | 6.1% |
| LNER | 22,003 | 65.9% | 3.3% |
| Hull Trains | 63 | – | – |
| Grand Central | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out