Brentwood
BREEast of EnglandManaged by Elizabeth line
How this station is performing
Brentwood had 109,118 scheduled stops to Period 7 of 2026-27, about 300 a day. 87.5% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Brentwood opened on 1 July 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Brentwood is the oldest; the next oldest, Harold Wood, dates from 1868.
The nearest stations to Brentwood are Shenfield (2.8 km north-east), Harold Wood (5.1 km south-west), West Horndon (5.7 km south-east), Upminster (6.9 km south-west) and Emerson Park (7.4 km south-west). 10 stations lie within 10 km in all. At 87.5%, Brentwood is less punctual than all of them; the best of the five, Upminster, manages 92.8%.
Brentwood takes its name from a town called Brentwood, home to about 77,047 people, and the station stands 0.8 km from its centre.
For Brentwood, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 79.5% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2025-26, at 94.5%, which is 15.0 percentage points higher. Cancellations peaked at 7.6% of scheduled stops in Period 11 of 2024-25, against 3.1% over the latest 13 periods.
1 of 3 stations of a similar size in East of England are more punctual than Brentwood on 87.5%. The comparison group includes Cheshunt (88.0%), Peterborough (70.0%) and Luton (80.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 109,118 | 87.5% | 3.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,440 | 89.3% | 2.6% |
| Period 6 of 2026-27 | 8,383 | 79.5% | 3.5% |
| Period 5 of 2026-27 | 8,450 | 79.9% | 6.5% |
| Period 4 of 2026-27 | 8,347 | 85.8% | 3.7% |
| Period 3 of 2026-27 | 8,434 | 86.7% | 4.2% |
| Period 2 of 2026-27 | 8,333 | 89.7% | 3.0% |
| Period 1 of 2026-27 | 9,664 | 90.6% | 2.3% |
| Period 13 of 2025-26 | 7,822 | 87.1% | 4.0% |
| Period 12 of 2025-26 | 8,456 | 92.1% | 1.3% |
| Period 11 of 2025-26 | 8,456 | 89.6% | 1.8% |
| Period 10 of 2025-26 | 7,572 | 91.6% | 2.3% |
| Period 9 of 2025-26 | 8,316 | 88.5% | 2.5% |
| Period 8 of 2025-26 | 8,445 | 85.9% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cheshunt | 103,951 | 88.0% | 2.5% |
| Peterborough | 103,878 | 70.0% | 3.3% |
| Luton | 103,732 | 80.1% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out