GTR at Stevenage
How this operator is doing here
GTR had 103,894 scheduled stops at Stevenage in the 13 periods to Period 7 of 2026-27, 80% of the station's total. 80.7% of recorded arrivals came within three minutes and 6.1% of stops were cancelled.
GTR trains at Stevenage also serve Knebworth (4.1 km south, 77.5% on time, 5.7% cancelled), Hitchin (6.8 km north-west, 77.3% on time, 6.9% cancelled), Watton-At-Stone (7.9 km south-east, 90.4% on time, 4.9% cancelled), Welwyn North (8.7 km south, 72.5% on time, 5.8% cancelled), Letchworth Garden City (8.9 km north, 72.5% on time, 8.3% cancelled) and Baldock (10.2 km north, 72.9% on time, 8.7% cancelled), which are the stations on its network closest to Stevenage.
Within 30 km of here, GTR runs best at Cuffley, 22.4 km south (92.1%), and worst at Meldreth, 25.7 km north-east (68.4%).
The busiest GTR station within 30 km of Stevenage is St Albans City, 18.8 km south-west, with about 329 scheduled stops a day.
Of the 3 operators with enough records at Stevenage, GTR is the most punctual, at 80.7%.
For GTR, Stevenage is the 197th best of 307 ranked stations. Its 80.7% here is 2.2 percentage points below the 82.9% across the whole network.
Over three full railway years GTR at Stevenage has improved each time, from 79.0% within three minutes in 2023-24 to 79.9% in 2024-25 and 82.7% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,168 | 74.2% | 4.3% |
| Period 6 of 2026-27 | 7,849 | 68.2% | 10.0% |
| Period 5 of 2026-27 | 7,958 | 74.2% | 7.6% |
| Period 4 of 2026-27 | 8,044 | 77.1% | 10.6% |
| Period 3 of 2026-27 | 8,212 | 82.9% | 8.0% |
| Period 2 of 2026-27 | 8,230 | 84.9% | 6.7% |
| Period 1 of 2026-27 | 9,483 | 86.5% | 5.6% |
| Period 13 of 2025-26 | 8,822 | 86.7% | 2.3% |
| Period 12 of 2025-26 | 6,849 | 83.4% | 5.1% |
| Period 11 of 2025-26 | 7,514 | 83.8% | 3.0% |
| Period 10 of 2025-26 | 7,119 | 84.8% | 3.1% |
| Period 9 of 2025-26 | 7,577 | 78.5% | 7.7% |
| Period 8 of 2025-26 | 8,069 | 81.2% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stevenage
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 22,003 | 65.9% | 3.3% |
| Lumo (East Coast) | 3,117 | 67.0% | 1.3% |
| Hull Trains | 63 | – | – |
| Grand Central | 4 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out