Southampton Central
SOUSouth EastManaged by South Western Railway
How this station is performing
Southampton Central had 115,564 scheduled stops to Period 7 of 2026-27, about 318 a day. 69.4% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Southampton Central opened on 1 June 1847. It was moved to the site it uses now on 1 November 1895. Of the 5 stations nearest to it with a known opening date, Southampton Central is the oldest; the next oldest, Millbrook (Hants), dates from 1861.
The nearest stations to Southampton Central are Millbrook (Hants) (1.5 km west), St Denys (2.4 km north-east), Woolston (2.8 km east), Bitterne (2.8 km north-east) and Sholing (3.7 km east). 17 stations lie within 10 km in all. At 69.4%, Southampton Central is less punctual than all of them; the best of the five, Woolston, manages 80.7%.
Southampton Central is named after Southampton, a big city, home to about 271,173 people, but the station stands 0.7 km from its centre.
4 operators call at Southampton Central: South Western Railway (68.0%, 60% of stops), GTR (84.3%, 19% of stops), Great Western Railway (59.7%, 11% of stops) and CrossCountry (60.2%, 10% of stops). The operator you travel with matters: GTR reaches 84.3% within three minutes while Great Western Railway manages 59.7%, a gap of 24.6 percentage points.
Compared with 3 stations of a similar size in South East, Southampton Central is the least punctual, at 69.4%. All of them are ahead, including Slough (87.9%), Sevenoaks (76.3%) and Redhill (78.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 68,828 | 68.0% | 2.9% |
| GTR | 22,466 | 84.3% | 6.9% |
| Great Western Railway | 12,777 | 59.7% | 4.0% |
| CrossCountry | 11,493 | 60.2% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Southampton Central? Delay Repay
These operators call at Southampton Central and publish Delay Repay rules.
- South Western Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- GTR: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Great Western Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,868 | 61.2% | 3.3% |
| Period 6 of 2026-27 | 8,777 | 61.4% | 2.7% |
| Period 5 of 2026-27 | 8,884 | 59.4% | 3.4% |
| Period 4 of 2026-27 | 8,891 | 61.9% | 4.3% |
| Period 3 of 2026-27 | 8,678 | 70.4% | 6.0% |
| Period 2 of 2026-27 | 8,981 | 68.4% | 6.0% |
| Period 1 of 2026-27 | 9,676 | 77.6% | 2.6% |
| Period 13 of 2025-26 | 9,811 | 80.0% | 3.4% |
| Period 12 of 2025-26 | 8,182 | 76.7% | 4.2% |
| Period 11 of 2025-26 | 8,990 | 77.5% | 5.0% |
| Period 10 of 2025-26 | 7,998 | 74.2% | 4.7% |
| Period 9 of 2025-26 | 8,987 | 65.4% | 3.1% |
| Period 8 of 2025-26 | 8,841 | 67.1% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out