Redhill
RDHSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Redhill had 118,715 scheduled stops to Period 7 of 2026-27, about 326 a day. 78.3% of recorded arrivals were within three minutes of the timetable and 5.9% of scheduled stops were cancelled.
Redhill opened on 12 July 1841. It was moved to the site it uses now on 15 April 1844. Of the 5 stations nearest to it with a known opening date, Redhill is the oldest; the next oldest, Merstham, dates from 1841.
The nearest stations to Redhill are Earlswood (Surrey) (1.4 km south), Reigate (2.6 km west), Nutfield (2.7 km south-east), Merstham (2.9 km north-east) and Salfords (Surrey) (4.3 km south). 21 stations lie within 10 km in all. Of the five, Nutfield is the most punctual at 82.5% and Earlswood (Surrey) the least at 76.2%, with Redhill on 78.3%.
Redhill is one of 6 stations named after a town called Redhill, home to about 18,163 people; this one stands 0.5 km from its centre.
3 operators call at Redhill: GTR (78.6%, 79% of stops), Great Western Railway (76.9%, 21% of stops) and Southeastern (–, 0% of stops). They are close together, with GTR leading on 78.6% and Great Western Railway trailing on 76.9%, a gap of 1.7 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Redhill on 78.3%. The comparison group includes Barnham (81.6%), Sevenoaks (76.3%) and Haywards Heath (71.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 93,934 | 78.6% | 5.4% |
| Great Western Railway | 24,777 | 76.9% | 8.0% |
| Southeastern | 4 | – | – |
Operators with their own page for this station are linked to it.
Late train at Redhill? Delay Repay
These operators call at Redhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,221 | 69.8% | 5.0% |
| Period 6 of 2026-27 | 9,047 | 66.5% | 7.4% |
| Period 5 of 2026-27 | 9,186 | 71.7% | 7.8% |
| Period 4 of 2026-27 | 9,338 | 77.6% | 8.4% |
| Period 3 of 2026-27 | 8,483 | 77.5% | 5.6% |
| Period 2 of 2026-27 | 9,121 | 84.8% | 4.6% |
| Period 1 of 2026-27 | 10,689 | 86.1% | 4.0% |
| Period 13 of 2025-26 | 10,039 | 86.6% | 2.9% |
| Period 12 of 2025-26 | 9,363 | 81.8% | 5.5% |
| Period 11 of 2025-26 | 7,773 | 78.3% | 5.0% |
| Period 10 of 2025-26 | 7,971 | 80.7% | 6.8% |
| Period 9 of 2025-26 | 9,255 | 74.3% | 8.8% |
| Period 8 of 2025-26 | 9,229 | 78.9% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barnham | 120,353 | 81.6% | 2.9% |
| Sevenoaks | 117,053 | 76.3% | 1.8% |
| Haywards Heath | 120,845 | 71.4% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out