Great Western Railway at Southampton Central
All trains at Southampton CentralGreat Western Railway across BritainSouth East
How this operator is doing here
Great Western Railway had 12,777 scheduled stops at Southampton Central in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 59.7% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
Great Western Railway trains at Southampton Central also serve Southampton Airport Parkway (5.9 km north-east, – on time, – cancelled), Eastleigh (8.1 km north-east, 59.5% on time, 3.1% cancelled), Chandlers Ford (8.7 km north, 58.5% on time, 1.4% cancelled), Hedge End (8.8 km east, – on time, – cancelled), Botley (10.9 km east, – on time, – cancelled) and Romsey (10.9 km north-west, 65.3% on time, 3.8% cancelled), which are the stations on its network closest to Southampton Central.
Within 30 km of here, Great Western Railway runs best at Fratton, 26.9 km south-east (66.9%), and worst at Portsmouth Harbour, 24.7 km south-east (63.9%).
The busiest Great Western Railway station within 30 km of Southampton Central is Romsey, 10.9 km north-west, with about 34 scheduled stops a day.
Great Western Railway at Southampton Central has slipped a little, from 63.7% within three minutes in the previous 13 periods to 59.7% in the latest 13, a fall of 4.0 percentage points. Cancellations fell to 4.0% of scheduled stops from 5.3%, which is 1.3 percentage points fewer.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 989 | 47.9% | 1.6% |
| Period 6 of 2026-27 | 992 | 48.2% | 3.1% |
| Period 5 of 2026-27 | 882 | 48.7% | 4.8% |
| Period 4 of 2026-27 | 995 | 51.1% | 6.3% |
| Period 3 of 2026-27 | 996 | 61.8% | 7.6% |
| Period 2 of 2026-27 | 994 | 60.4% | 6.3% |
| Period 1 of 2026-27 | 1,070 | 70.0% | 1.7% |
| Period 13 of 2025-26 | 1,093 | 74.3% | 2.3% |
| Period 12 of 2025-26 | 898 | 68.9% | 1.2% |
| Period 11 of 2025-26 | 994 | 71.6% | 4.4% |
| Period 10 of 2025-26 | 907 | 57.2% | 5.4% |
| Period 9 of 2025-26 | 997 | 54.7% | 2.0% |
| Period 8 of 2025-26 | 970 | 58.0% | 5.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Southampton Central
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 68,828 | 68.0% | 2.9% |
| GTR | 22,466 | 84.3% | 6.9% |
| CrossCountry | 11,493 | 60.2% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out