Slough
SLOSouth EastManaged by Great Western Railway
How this station is performing
Slough had 115,930 scheduled stops to Period 7 of 2026-27, about 318 a day. 87.9% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Slough opened on 4 June 1838. It was moved to the site it uses now on 8 September 1884. Of the 5 stations nearest to it with a known opening date, Slough is the oldest; the next oldest, Langley (Berks), dates from 1846.
The nearest stations to Slough are Windsor and Eton Riverside (3.0 km south), Datchet (3.3 km south), Windsor and Eton Central (3.4 km south), Langley (Berks) (3.6 km east) and Burnham (Buckinghamshire) (4.1 km west). 17 stations lie within 10 km in all. Of the five, Windsor and Eton Central is the most punctual at 99.0% and Langley (Berks) the least at 84.5%, with Slough on 87.9%.
Slough is one of 3 stations named after a big city called Slough, home to about 119,070 people; this one stands 0.3 km from its centre.
2 operators call at Slough: Great Western Railway (90.9%, 55% of stops) and Elizabeth line (84.3%, 45% of stops). The operator you travel with matters: Great Western Railway reaches 90.9% within three minutes while Elizabeth line manages 84.3%, a gap of 6.6 percentage points.
Compared with 3 stations of a similar size in South East, Slough is the most punctual, at 87.9%. The comparison group includes Southampton Central (69.4%), Sevenoaks (76.3%) and Redhill (78.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 63,640 | 90.9% | 3.2% |
| Elizabeth line | 52,290 | 84.3% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Slough? Delay Repay
These operators call at Slough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,887 | 87.4% | 2.4% |
| Period 6 of 2026-27 | 7,893 | 87.8% | 3.4% |
| Period 5 of 2026-27 | 8,968 | 87.3% | 5.7% |
| Period 4 of 2026-27 | 8,818 | 88.2% | 2.9% |
| Period 3 of 2026-27 | 8,740 | 89.1% | 4.6% |
| Period 2 of 2026-27 | 8,920 | 89.4% | 3.9% |
| Period 1 of 2026-27 | 10,212 | 88.8% | 4.1% |
| Period 13 of 2025-26 | 9,838 | 90.0% | 2.0% |
| Period 12 of 2025-26 | 8,958 | 87.9% | 3.1% |
| Period 11 of 2025-26 | 8,947 | 90.0% | 4.4% |
| Period 10 of 2025-26 | 7,906 | 85.8% | 2.7% |
| Period 9 of 2025-26 | 8,923 | 84.9% | 2.4% |
| Period 8 of 2025-26 | 8,920 | 85.7% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southampton Central | 115,564 | 69.4% | 4.1% |
| Sevenoaks | 117,053 | 76.3% | 1.8% |
| Redhill | 118,715 | 78.3% | 5.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out