Sevenoaks
SEVSouth EastManaged by Southeastern
How this station is performing
Sevenoaks had 117,053 scheduled stops to Period 7 of 2026-27, about 322 a day. 76.3% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Sevenoaks opened on 2 March 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bat and Ball is the oldest (1862) and Otford the newest (1882), with Sevenoaks in between.
The nearest stations to Sevenoaks are Bat and Ball (1.7 km north-east), Dunton Green (2.3 km north), Otford (4.2 km north), Kemsing (5.1 km north-east) and Shoreham (Kent) (6.2 km north). 11 stations lie within 10 km in all. At 76.3%, Sevenoaks is less punctual than all of them; the best of the five, Bat and Ball, manages 91.9%.
Sevenoaks takes its name from a market town called Sevenoaks, home to about 21,167 people, and the station stands 0.4 km from its centre.
2 operators call at Sevenoaks: Southeastern (72.3%, 78% of stops) and GTR (90.6%, 22% of stops). The operator you travel with matters: GTR reaches 90.6% within three minutes while Southeastern manages 72.3%, a gap of 18.3 percentage points.
2 of 3 stations of a similar size in South East are more punctual than Sevenoaks on 76.3%. The comparison group includes Slough (87.9%), Southampton Central (69.4%) and Redhill (78.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 90,721 | 72.3% | 1.6% |
| GTR | 26,332 | 90.6% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Sevenoaks? Delay Repay
These operators call at Sevenoaks and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,967 | 68.0% | 1.3% |
| Period 6 of 2026-27 | 8,815 | 62.2% | 1.9% |
| Period 5 of 2026-27 | 9,067 | 74.6% | 2.3% |
| Period 4 of 2026-27 | 9,058 | 79.4% | 1.6% |
| Period 3 of 2026-27 | 9,000 | 77.6% | 2.4% |
| Period 2 of 2026-27 | 8,754 | 81.1% | 2.2% |
| Period 1 of 2026-27 | 9,709 | 82.6% | 1.7% |
| Period 13 of 2025-26 | 9,964 | 80.7% | 1.8% |
| Period 12 of 2025-26 | 9,108 | 81.4% | 1.2% |
| Period 11 of 2025-26 | 8,904 | 80.3% | 1.2% |
| Period 10 of 2025-26 | 7,702 | 76.5% | 2.0% |
| Period 9 of 2025-26 | 8,832 | 71.7% | 2.3% |
| Period 8 of 2025-26 | 9,173 | 75.0% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Slough | 115,930 | 87.9% | 3.5% |
| Southampton Central | 115,564 | 69.4% | 4.1% |
| Redhill | 118,715 | 78.3% | 5.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out