GTR at Southampton Central
All trains at Southampton CentralGTR across BritainSouth East
How this operator is doing here
GTR had 22,466 scheduled stops at Southampton Central in the 13 periods to Period 7 of 2026-27, 19% of the station's total. 84.3% of recorded arrivals came within three minutes and 6.9% of stops were cancelled.
GTR trains at Southampton Central also serve St Denys (2.4 km north-east, – on time, – cancelled), Woolston (2.8 km east, 84.5% on time, 7.6% cancelled), Sholing (3.7 km east, – on time, – cancelled), Southampton Airport Parkway (5.9 km north-east, 66.7% on time, 7.5% cancelled), Netley (6.2 km south-east, – on time, – cancelled) and Eastleigh (8.1 km north-east, 58.4% on time, 7.6% cancelled), which are the stations on its network closest to Southampton Central.
Within 30 km of here, GTR runs best at Woolston, 2.8 km east (84.5%), and worst at Fratton, 26.9 km south-east (73.2%).
The busiest GTR station within 30 km of Southampton Central is Fratton, 26.9 km south-east, with about 92 scheduled stops a day.
Of the 4 operators with enough records at Southampton Central, GTR is the most punctual, at 84.3%.
GTR at Southampton Central has slipped a little, from 88.8% within three minutes in the previous 13 periods to 84.3% in the latest 13, a fall of 4.5 percentage points. Cancellations held steady at 6.9% of scheduled stops, against 6.7% before.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,749 | 79.0% | 5.7% |
| Period 6 of 2026-27 | 1,629 | 72.6% | 6.3% |
| Period 5 of 2026-27 | 1,779 | 79.0% | 3.9% |
| Period 4 of 2026-27 | 1,742 | 85.9% | 4.5% |
| Period 3 of 2026-27 | 1,640 | 87.6% | 9.4% |
| Period 2 of 2026-27 | 1,744 | 85.4% | 10.4% |
| Period 1 of 2026-27 | 1,891 | 86.2% | 5.6% |
| Period 13 of 2025-26 | 1,918 | 87.5% | 6.3% |
| Period 12 of 2025-26 | 1,579 | 85.6% | 7.0% |
| Period 11 of 2025-26 | 1,775 | 89.8% | 7.4% |
| Period 10 of 2025-26 | 1,522 | 89.5% | 9.4% |
| Period 9 of 2025-26 | 1,748 | 83.9% | 5.3% |
| Period 8 of 2025-26 | 1,750 | 84.3% | 8.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Southampton Central
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 68,828 | 68.0% | 2.9% |
| Great Western Railway | 12,777 | 59.7% | 4.0% |
| CrossCountry | 11,493 | 60.2% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out