Southall
STLLondonManaged by Elizabeth line
How this station is performing
Southall had 108,390 scheduled stops to Period 7 of 2026-27, about 298 a day. 86.4% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Southall opened on 1 May 1839, 187 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hanwell is the oldest (1838) and Drayton Green the newest (1905), with Southall in between.
The nearest stations to Southall are Hanwell (2.8 km east), Hayes and Harlington (2.9 km west), Drayton Green (3.5 km east), Castle Bar Park (3.7 km north-east) and West Ealing (4.0 km east). 51 stations lie within 10 km in all. Of the five, Castle Bar Park is the most punctual at 96.8% and Hayes and Harlington the least at 85.4%, with Southall on 86.4%.
Southall takes its name from an area of London called Southall, home to about 78,253 people, and the station stands 0.6 km from its centre.
2 operators call at Southall: Elizabeth line (86.5%, 98% of stops) and Great Western Railway (82.5%, 2% of stops). They are close together, with Elizabeth line leading on 86.5% and Great Western Railway trailing on 82.5%, a gap of 4.0 percentage points.
2 of 3 stations of a similar size in London are more punctual than Southall on 86.4%. The comparison group includes Harrow and Wealdstone (83.5%), Harold Wood (88.1%) and London Fenchurch Street (88.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 105,871 | 86.5% | 3.9% |
| Great Western Railway | 2,519 | 82.5% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Southall? Delay Repay
These operators call at Southall and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,380 | 85.6% | 3.2% |
| Period 6 of 2026-27 | 7,704 | 85.0% | 3.9% |
| Period 5 of 2026-27 | 8,435 | 84.5% | 8.0% |
| Period 4 of 2026-27 | 8,384 | 88.0% | 2.3% |
| Period 3 of 2026-27 | 8,126 | 86.0% | 3.9% |
| Period 2 of 2026-27 | 8,311 | 87.9% | 4.4% |
| Period 1 of 2026-27 | 9,391 | 87.9% | 4.5% |
| Period 13 of 2025-26 | 9,057 | 88.4% | 2.0% |
| Period 12 of 2025-26 | 8,265 | 87.4% | 2.7% |
| Period 11 of 2025-26 | 8,273 | 88.1% | 5.0% |
| Period 10 of 2025-26 | 7,730 | 86.4% | 3.2% |
| Period 9 of 2025-26 | 8,115 | 83.9% | 3.1% |
| Period 8 of 2025-26 | 8,219 | 83.6% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harrow and Wealdstone | 108,038 | 83.5% | 5.1% |
| Harold Wood | 109,118 | 88.1% | 3.3% |
| London Fenchurch Street | 106,123 | 88.3% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out