Harrow and Wealdstone
HRWLondonManaged by London Underground
How this station is performing
Harrow and Wealdstone had 108,038 scheduled stops to Period 7 of 2026-27, about 297 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Harrow and Wealdstone opened on 20 July 1837, 189 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Harrow and Wealdstone is the oldest; the next oldest, Hatch End, dates from 1842.
The nearest stations to Harrow and Wealdstone are Harrow-on-the-Hill (1.4 km south), Kenton (1.7 km south-east), Headstone Lane (1.9 km north-west), Hatch End (3.0 km north-west) and South Kenton (3.1 km south-east). 34 stations lie within 10 km in all. At 83.5%, Harrow and Wealdstone is less punctual than all of them; the best of the five, Harrow-on-the-Hill, manages 88.2%.
Harrow and Wealdstone is named after Harrow, an area of London, home to about 149,246 people, but the station stands 1.2 km from its centre.
4 operators call at Harrow and Wealdstone: London Overground (86.7%, 48% of stops), West Midlands Railway (79.4%, 41% of stops), GTR (84.8%, 11% of stops) and Avanti (–, 0% of stops). The operator you travel with matters: London Overground reaches 86.7% within three minutes while West Midlands Railway manages 79.4%, a gap of 7.3 percentage points.
Compared with 3 stations of a similar size in London, Harrow and Wealdstone is the least punctual, at 83.5%. All of them are ahead, including Southall (86.4%), Harold Wood (88.1%) and London Fenchurch Street (88.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 86.7% | 2.9% |
| West Midlands Railway | 44,762 | 79.4% | 7.1% |
| GTR | 11,844 | 84.8% | 6.8% |
| Avanti | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Harrow and Wealdstone? Delay Repay
These operators call at Harrow and Wealdstone and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,328 | 83.6% | 3.8% |
| Period 6 of 2026-27 | 8,452 | 81.6% | 6.4% |
| Period 5 of 2026-27 | 8,250 | 84.5% | 7.7% |
| Period 4 of 2026-27 | 8,318 | 80.6% | 4.7% |
| Period 3 of 2026-27 | 8,293 | 82.9% | 4.6% |
| Period 2 of 2026-27 | 7,999 | 83.2% | 8.2% |
| Period 1 of 2026-27 | 8,175 | 83.6% | 4.4% |
| Period 13 of 2025-26 | 9,347 | 87.2% | 2.8% |
| Period 12 of 2025-26 | 8,434 | 84.3% | 4.6% |
| Period 11 of 2025-26 | 8,423 | 83.1% | 4.8% |
| Period 10 of 2025-26 | 7,510 | 84.5% | 4.6% |
| Period 9 of 2025-26 | 8,162 | 81.9% | 4.9% |
| Period 8 of 2025-26 | 8,347 | 84.4% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southall | 108,390 | 86.4% | 3.9% |
| Harold Wood | 109,118 | 88.1% | 3.3% |
| London Fenchurch Street | 106,123 | 88.3% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out