Harold Wood
HROLondonManaged by Elizabeth line
How this station is performing
Harold Wood had 109,118 scheduled stops to Period 7 of 2026-27, about 300 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Harold Wood opened on 1 February 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Romford is the oldest (1839) and Gidea Park the newest (1910), with Harold Wood in between.
The nearest stations to Harold Wood are Gidea Park (2.4 km south-west), Emerson Park (2.9 km south), Upminster (4.0 km south), Romford (4.1 km south-west) and Brentwood (5.1 km north-east). 12 stations lie within 10 km in all. Of the five, Upminster is the most punctual at 92.8% and Brentwood the least at 87.5%, with Harold Wood on 88.1%.
Harold Wood takes its name from an area of London called Harold Wood, and the station stands 0.2 km from its centre.
For Harold Wood, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 82.0% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2025-26, at 94.5%, which is 12.5 percentage points higher. Cancellations peaked at 7.8% of scheduled stops in Period 11 of 2024-25, against 3.3% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Harold Wood on 88.1%. The comparison group includes Southall (86.4%), Harrow and Wealdstone (83.5%) and London Fenchurch Street (88.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 109,118 | 88.1% | 3.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,440 | 89.6% | 2.8% |
| Period 6 of 2026-27 | 8,383 | 82.0% | 3.6% |
| Period 5 of 2026-27 | 8,450 | 82.7% | 6.8% |
| Period 4 of 2026-27 | 8,348 | 85.5% | 3.9% |
| Period 3 of 2026-27 | 8,434 | 86.2% | 4.3% |
| Period 2 of 2026-27 | 8,333 | 90.0% | 3.1% |
| Period 1 of 2026-27 | 9,664 | 90.9% | 2.5% |
| Period 13 of 2025-26 | 7,821 | 87.8% | 4.1% |
| Period 12 of 2025-26 | 8,456 | 92.4% | 1.3% |
| Period 11 of 2025-26 | 8,456 | 90.0% | 2.2% |
| Period 10 of 2025-26 | 7,572 | 91.9% | 2.4% |
| Period 9 of 2025-26 | 8,316 | 88.8% | 2.6% |
| Period 8 of 2025-26 | 8,445 | 87.4% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southall | 108,390 | 86.4% | 3.9% |
| Harrow and Wealdstone | 108,038 | 83.5% | 5.1% |
| London Fenchurch Street | 106,123 | 88.3% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out