Elizabeth line had 105,871 scheduled stops at Southall in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 86.5% of recorded arrivals came within three minutes and 3.9% of stops were cancelled.
Elizabeth line trains at Southall also serve Hanwell (2.8 km east, 86.2% on time, 4.2% cancelled), Hayes and Harlington (2.9 km west, 85.5% on time, 4.8% cancelled), West Ealing (4.0 km east, 85.2% on time, 4.9% cancelled), Ealing Broadway (5.4 km east, 82.9% on time, 4.3% cancelled), Heathrow Terminals 2 and 3 (Rail Station Only) (6.5 km south-west, 88.0% on time, 6.2% cancelled) and West Drayton (6.6 km west, 84.9% on time, 4.1% cancelled), which are the stations on its network closest to Southall.
Within 30 km of here, Elizabeth line runs best at Canary Wharf, 24.9 km east (93.9%), and worst at Ealing Broadway, 5.4 km east (82.9%).
The busiest Elizabeth line station within 30 km of Southall is London Paddington, 13.9 km east, with about 644 scheduled stops a day.
Of the 2 operators with enough records at Southall, Elizabeth line is the most punctual, at 86.5%.
For Elizabeth line, Southall is the 27th best of 41 ranked stations. Its 86.5% here is 3.1 percentage points below the 89.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,189 | 85.5% | 3.3% |
| Period 6 of 2026-27 | 7,512 | 85.2% | 4.0% |
| Period 5 of 2026-27 | 8,243 | 84.5% | 8.1% |
| Period 4 of 2026-27 | 8,192 | 88.2% | 2.3% |
| Period 3 of 2026-27 | 7,934 | 86.2% | 3.9% |
| Period 2 of 2026-27 | 8,119 | 88.1% | 4.4% |
| Period 1 of 2026-27 | 9,168 | 87.9% | 4.5% |
| Period 13 of 2025-26 | 8,849 | 88.3% | 2.0% |
| Period 12 of 2025-26 | 8,074 | 87.6% | 2.7% |
| Period 11 of 2025-26 | 8,081 | 88.1% | 5.0% |
| Period 10 of 2025-26 | 7,559 | 86.5% | 3.0% |
| Period 9 of 2025-26 | 7,924 | 84.0% | 3.1% |
| Period 8 of 2025-26 | 8,027 | 83.7% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Southall
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 2,519 | 82.5% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out