London Fenchurch Street
FSTLondonManaged by c2c
How this station is performing
London Fenchurch Street had 106,123 scheduled stops to Period 7 of 2026-27, about 292 a day. 88.3% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
London Fenchurch Street opened on 29 July 1841, 185 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, London Bridge is the oldest (1836) and Moorgate the newest (1976), with London Fenchurch Street in between.
The nearest stations to London Fenchurch Street are London Liverpool Street (0.8 km north), London Bridge (0.9 km south-west), London Cannon Street (0.9 km west), Moorgate (1.1 km north-west) and Shoreditch High Street (1.3 km north). 141 stations lie within 10 km in all. Of the five, Shoreditch High Street is the most punctual at 92.0% and London Bridge the least at 83.2%, with London Fenchurch Street on 88.3%.
London Fenchurch Street is named after London, a city, home to about 8,799,728 people, but the station stands 3.5 km from its centre.
Compared with 3 stations of a similar size in London, London Fenchurch Street is the most punctual, at 88.3%. The comparison group includes Camden Road (79.9%), Dalston Kingsland (81.8%) and Caledonian Road and Barnsbury (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| c2c | 106,123 | 88.3% | 1.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,315 | 79.3% | 1.6% |
| Period 6 of 2026-27 | 7,676 | 77.5% | 4.2% |
| Period 5 of 2026-27 | 8,017 | 84.3% | 1.6% |
| Period 4 of 2026-27 | 8,304 | 89.7% | 2.7% |
| Period 3 of 2026-27 | 7,980 | 88.8% | 2.4% |
| Period 2 of 2026-27 | 7,571 | 91.7% | 2.9% |
| Period 1 of 2026-27 | 7,988 | 92.8% | 1.7% |
| Period 13 of 2025-26 | 9,580 | 93.6% | 1.0% |
| Period 12 of 2025-26 | 8,352 | 92.8% | 1.4% |
| Period 11 of 2025-26 | 8,248 | 90.9% | 0.7% |
| Period 10 of 2025-26 | 7,417 | 87.0% | 2.0% |
| Period 9 of 2025-26 | 8,581 | 88.6% | 0.7% |
| Period 8 of 2025-26 | 8,094 | 89.4% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Camden Road | 106,119 | 79.9% | 8.4% |
| Dalston Kingsland | 105,836 | 81.8% | 10.3% |
| Caledonian Road and Barnsbury | 105,834 | 79.3% | 9.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out