Great Western Railway at Southall
All trains at SouthallGreat Western Railway across BritainLondon
How this operator is doing here
Great Western Railway had 2,519 scheduled stops at Southall in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 82.5% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
Great Western Railway trains at Southall also serve Hayes and Harlington (2.9 km west, 81.1% on time, 3.5% cancelled), Drayton Green (3.5 km east, 96.2% on time, 4.3% cancelled), Castle Bar Park (3.7 km north-east, 96.8% on time, 4.3% cancelled), West Ealing (4.0 km east, 96.0% on time, 4.3% cancelled), South Greenford (4.2 km north-east, 97.3% on time, 4.3% cancelled) and Greenford (4.6 km north-east, 96.8% on time, 4.3% cancelled), which are the stations on its network closest to Southall.
Within 30 km of here, Great Western Railway runs best at Windsor and Eton Central, 16.3 km west (99.0%), and worst at London Paddington, 13.9 km east (68.9%).
The busiest Great Western Railway station within 30 km of Southall is London Paddington, 13.9 km east, with about 363 scheduled stops a day.
Of the 2 operators with enough records at Southall, Great Western Railway is the least punctual, at 82.5%.
Over three full railway years Great Western Railway at Southall has improved each time, from 76.7% within three minutes in 2023-24 to 78.3% in 2024-25 and 82.2% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 191 | 86.6% | 2.1% |
| Period 6 of 2026-27 | 192 | 76.6% | 2.1% |
| Period 5 of 2026-27 | 192 | 83.4% | 2.6% |
| Period 4 of 2026-27 | 192 | 78.7% | 4.7% |
| Period 3 of 2026-27 | 192 | 79.7% | 2.6% |
| Period 2 of 2026-27 | 192 | 79.2% | 4.7% |
| Period 1 of 2026-27 | 223 | 87.3% | 0.9% |
| Period 13 of 2025-26 | 208 | 89.2% | 1.9% |
| Period 12 of 2025-26 | 191 | 80.7% | 5.2% |
| Period 11 of 2025-26 | 192 | 88.2% | 3.1% |
| Period 10 of 2025-26 | 171 | 84.0% | 12.3% |
| Period 9 of 2025-26 | 191 | 76.6% | 3.7% |
| Period 8 of 2025-26 | 192 | 81.3% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Southall
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 105,871 | 86.5% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out