Slade Green
SGRLondonManaged by Southeastern
How this station is performing
Slade Green had 79,526 scheduled stops to Period 7 of 2026-27, about 218 a day. 89.2% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Slade Green opened on 1 July 1900, 126 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Slade Green is the newest; the oldest, Erith, opened in 1849.
The nearest stations to Slade Green are Erith (1.9 km north-west), Barnehurst (2.1 km west), Crayford (2.3 km south), Dartford (3.0 km south-east) and Purfleet (3.5 km north-east). 32 stations lie within 10 km in all. Of the five, Erith is the most punctual at 92.2% and Dartford the least at 82.4%, with Slade Green on 89.2%.
Slade Green takes its name from an area of London called Slade Green, and the station stands 0.4 km from its centre.
2 operators call at Slade Green: Southeastern (90.8%, 72% of stops) and GTR (84.9%, 28% of stops). The operator you travel with matters: Southeastern reaches 90.8% within three minutes while GTR manages 84.9%, a gap of 5.9 percentage points.
Compared with 3 stations of a similar size in London, Slade Green is the least punctual, at 89.2%. All of them are ahead, including Plumstead (89.4%), Feltham (89.8%) and Battersea Park (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 57,183 | 90.8% | 1.6% |
| GTR | 22,343 | 84.9% | 6.4% |
Operators with their own page for this station are linked to it.
Late train at Slade Green? Delay Repay
These operators call at Slade Green and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,303 | 89.5% | 2.2% |
| Period 6 of 2026-27 | 6,118 | 88.3% | 2.0% |
| Period 5 of 2026-27 | 5,729 | 89.7% | 3.2% |
| Period 4 of 2026-27 | 6,140 | 89.5% | 2.3% |
| Period 3 of 2026-27 | 5,205 | 86.7% | 4.5% |
| Period 2 of 2026-27 | 6,089 | 88.4% | 3.4% |
| Period 1 of 2026-27 | 7,088 | 90.2% | 2.3% |
| Period 13 of 2025-26 | 6,875 | 89.6% | 1.7% |
| Period 12 of 2025-26 | 6,352 | 89.2% | 2.8% |
| Period 11 of 2025-26 | 6,036 | 91.2% | 3.4% |
| Period 10 of 2025-26 | 5,510 | 91.7% | 3.5% |
| Period 9 of 2025-26 | 6,131 | 87.6% | 3.9% |
| Period 8 of 2025-26 | 5,950 | 87.7% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Plumstead | 79,656 | 89.4% | 3.0% |
| Feltham | 78,661 | 89.8% | 2.4% |
| Battersea Park | 80,708 | 94.1% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out