Feltham
FELLondonManaged by South Western Railway
How this station is performing
Feltham had 78,661 scheduled stops to Period 7 of 2026-27, about 216 a day. 89.8% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Feltham opened on 22 August 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Feltham is the oldest; the next oldest, Hounslow, dates from 1850.
The nearest stations to Feltham are Heathrow Terminal 4 (Rail Station Only) (2.8 km north-west), Kempton Park Racecourse (3.0 km south), Sunbury (3.3 km south), Whitton (London) (3.6 km east) and Hounslow (3.7 km north-east). 46 stations lie within 10 km in all. Of the five, Whitton (London) is the most punctual at 91.1% and Hounslow the least at 84.7%, with Feltham on 89.8%.
Feltham is one of 2 stations named after an area of London called Feltham, home to about 63,368 people; this one stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Feltham was Period 9 of 2024-25, at 71.4%, some time before the latest year. The strongest was Period 1 of 2026-27, at 93.1%, and the two are 21.7 percentage points apart. Cancellations peaked at 5.5% of scheduled stops in Period 2 of 2026-27, against 2.4% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Feltham is the most punctual, at 89.8%. The comparison group includes Charlton (87.1%), Woolwich Arsenal (88.2%) and Shortlands (86.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 78,661 | 89.8% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Feltham? Delay Repay
These operators call at Feltham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,317 | 91.5% | 1.3% |
| Period 6 of 2026-27 | 6,084 | 91.0% | 2.7% |
| Period 5 of 2026-27 | 6,083 | 90.1% | 2.2% |
| Period 4 of 2026-27 | 6,084 | 90.6% | 2.2% |
| Period 3 of 2026-27 | 5,980 | 88.9% | 2.4% |
| Period 2 of 2026-27 | 6,102 | 90.0% | 5.5% |
| Period 1 of 2026-27 | 6,685 | 93.1% | 2.3% |
| Period 13 of 2025-26 | 6,538 | 91.4% | 1.5% |
| Period 12 of 2025-26 | 6,109 | 92.0% | 2.3% |
| Period 11 of 2025-26 | 6,087 | 91.3% | 1.3% |
| Period 10 of 2025-26 | 5,544 | 90.5% | 2.3% |
| Period 9 of 2025-26 | 5,948 | 83.6% | 1.9% |
| Period 8 of 2025-26 | 6,100 | 83.0% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Charlton | 78,340 | 87.1% | 2.9% |
| Woolwich Arsenal | 78,335 | 88.2% | 3.0% |
| Shortlands | 78,112 | 86.9% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out