Plumstead
PLULondonManaged by Southeastern
How this station is performing
Plumstead had 79,656 scheduled stops to Period 7 of 2026-27, about 219 a day. 89.4% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Plumstead opened on 16 July 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Woolwich Arsenal is the oldest (1849) and Woolwich the newest (2022), with Plumstead in between.
The nearest stations to Plumstead are Woolwich (1.0 km west), Woolwich Arsenal (1.0 km west), Woolwich Dockyard (2.0 km west), Abbey Wood (2.5 km east) and Welling (3.0 km south-east). 70 stations lie within 10 km in all. Of the five, Woolwich is the most punctual at 93.9% and Welling the least at 86.0%, with Plumstead on 89.4%.
Plumstead is one of 4 stations named after an area of London called Plumstead, home to about 16,736 people; this one stands 0.4 km from its centre.
2 operators call at Plumstead: Southeastern (90.9%, 71% of stops) and GTR (85.5%, 29% of stops). The operator you travel with matters: Southeastern reaches 90.9% within three minutes while GTR manages 85.5%, a gap of 5.4 percentage points.
2 of 3 stations of a similar size in London are more punctual than Plumstead on 89.4%. The comparison group includes Slade Green (89.2%), Feltham (89.8%) and Battersea Park (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 56,562 | 90.9% | 1.6% |
| GTR | 23,094 | 85.5% | 6.3% |
Operators with their own page for this station are linked to it.
Late train at Plumstead? Delay Repay
These operators call at Plumstead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,307 | 90.2% | 2.3% |
| Period 6 of 2026-27 | 6,138 | 88.6% | 2.0% |
| Period 5 of 2026-27 | 5,697 | 90.1% | 3.3% |
| Period 4 of 2026-27 | 6,137 | 89.8% | 2.3% |
| Period 3 of 2026-27 | 5,203 | 87.3% | 4.6% |
| Period 2 of 2026-27 | 6,085 | 88.6% | 3.4% |
| Period 1 of 2026-27 | 7,052 | 90.3% | 2.3% |
| Period 13 of 2025-26 | 6,923 | 89.5% | 1.7% |
| Period 12 of 2025-26 | 6,125 | 88.6% | 3.2% |
| Period 11 of 2025-26 | 6,035 | 91.5% | 3.4% |
| Period 10 of 2025-26 | 5,510 | 92.1% | 3.4% |
| Period 9 of 2025-26 | 6,148 | 88.2% | 4.0% |
| Period 8 of 2025-26 | 6,296 | 87.1% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Slade Green | 79,526 | 89.2% | 2.9% |
| Feltham | 78,661 | 89.8% | 2.4% |
| Battersea Park | 80,708 | 94.1% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out