Southeastern had 57,183 scheduled stops at Slade Green in the 13 periods to Period 7 of 2026-27, 72% of the station's total. 90.8% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at Slade Green also serve Erith (1.9 km north-west, 92.2% on time, 1.6% cancelled), Barnehurst (2.1 km west, 85.8% on time, 2.0% cancelled), Crayford (2.3 km south, 88.4% on time, 1.4% cancelled), Dartford (3.0 km south-east, 83.2% on time, 1.3% cancelled), Belvedere (3.7 km north-west, 92.6% on time, 1.6% cancelled) and Bexleyheath (4.0 km west, 84.1% on time, 2.0% cancelled), which are the stations on its network closest to Slade Green.
Within 30 km of here, Southeastern runs best at Sundridge Park, 13.1 km south-west (99.4%), and worst at Hildenborough, 28.3 km south (70.3%).
The busiest Southeastern station within 30 km of Slade Green is London Bridge, 19.5 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Slade Green, Southeastern is the most punctual, at 90.8%.
Over three full railway years Southeastern at Slade Green has improved each time, from 85.5% within three minutes in 2023-24 to 91.1% in 2024-25 and 91.6% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,378 | 91.2% | 0.8% |
| Period 6 of 2026-27 | 4,370 | 90.9% | 0.8% |
| Period 5 of 2026-27 | 4,366 | 91.3% | 2.1% |
| Period 4 of 2026-27 | 4,396 | 91.7% | 1.6% |
| Period 3 of 2026-27 | 3,948 | 88.0% | 4.1% |
| Period 2 of 2026-27 | 4,211 | 90.2% | 2.5% |
| Period 1 of 2026-27 | 5,095 | 91.2% | 1.4% |
| Period 13 of 2025-26 | 4,808 | 90.5% | 1.3% |
| Period 12 of 2025-26 | 5,167 | 90.3% | 1.2% |
| Period 11 of 2025-26 | 4,239 | 93.0% | 1.1% |
| Period 10 of 2025-26 | 3,721 | 92.9% | 0.9% |
| Period 9 of 2025-26 | 4,322 | 89.5% | 1.2% |
| Period 8 of 2025-26 | 4,162 | 90.0% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Slade Green
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 22,343 | 84.9% | 6.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out