Battersea Park
BAKLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Battersea Park had 80,708 scheduled stops to Period 7 of 2026-27, about 222 a day. 94.1% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Battersea Park opened on 1 May 1867, 159 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Vauxhall is the oldest (1838) and Queenstown Road (Battersea) the newest (1877), with Battersea Park in between.
The nearest stations to Battersea Park are Queenstown Road (Battersea) (0.3 km south), Wandsworth Road (1.1 km south-east), Clapham High Street (1.7 km south-east), London Victoria (1.9 km north) and Vauxhall (1.9 km north-east). 134 stations lie within 10 km in all. At 94.1%, Battersea Park is more punctual than every one of them; the best of the five, Wandsworth Road, manages 92.5%.
Battersea Park is named after Battersea, an area of London, home to about 73,345 people, but the station stands 2.1 km from its centre.
3 operators call at Battersea Park: GTR (94.1%, 97% of stops), London Overground (94.3%, 3% of stops) and Southeastern (–, 0% of stops). They are close together, with London Overground leading on 94.3% and GTR trailing on 94.1%, a gap of 0.2 percentage points.
Compared with 3 stations of a similar size in London, Battersea Park is the most punctual, at 94.1%. The comparison group includes Plumstead (89.4%), Slade Green (89.2%) and Heathrow Terminal 5 (Rail Station Only) (91.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 78,348 | 94.1% | 2.8% |
| London Overground | 2,359 | 94.3% | 5.6% |
| Southeastern | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Battersea Park? Delay Repay
These operators call at Battersea Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,340 | 92.9% | 5.6% |
| Period 6 of 2026-27 | 6,115 | 94.0% | 1.3% |
| Period 5 of 2026-27 | 6,581 | 92.5% | 4.2% |
| Period 4 of 2026-27 | 6,179 | 94.8% | 2.5% |
| Period 3 of 2026-27 | 6,246 | 93.7% | 2.3% |
| Period 2 of 2026-27 | 5,937 | 94.2% | 2.1% |
| Period 1 of 2026-27 | 6,545 | 95.4% | 1.9% |
| Period 13 of 2025-26 | 6,941 | 94.1% | 3.1% |
| Period 12 of 2025-26 | 6,020 | 95.2% | 3.4% |
| Period 11 of 2025-26 | 6,070 | 93.2% | 2.5% |
| Period 10 of 2025-26 | 5,560 | 94.7% | 2.1% |
| Period 9 of 2025-26 | 6,200 | 94.5% | 1.6% |
| Period 8 of 2025-26 | 5,974 | 94.7% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Plumstead | 79,656 | 89.4% | 3.0% |
| Slade Green | 79,526 | 89.2% | 2.9% |
| Heathrow Terminal 5 (Rail Station Only) | 81,940 | 91.2% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out