GTR at Sevenoaks
How this operator is doing here
GTR had 26,332 scheduled stops at Sevenoaks in the 13 periods to Period 7 of 2026-27, 22% of the station's total. 90.6% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
GTR trains at Sevenoaks also serve Bat and Ball (1.7 km north-east, 91.9% on time, 3.1% cancelled), Otford (4.2 km north, 91.3% on time, 3.1% cancelled), Shoreham (Kent) (6.2 km north, 91.3% on time, 3.1% cancelled), Penshurst (8.8 km south, 88.7% on time, 1.4% cancelled), Leigh (Kent) (9.4 km south, 87.4% on time, 1.4% cancelled) and Eynsford (9.7 km north, 89.8% on time, 3.1% cancelled), which are the stations on its network closest to Sevenoaks.
Within 30 km of here, GTR runs best at Beckenham Junction, 20.8 km north-west (98.1%), and worst at Kenley, 20.4 km west (66.9%).
The busiest GTR station within 30 km of Sevenoaks is East Croydon, 22.1 km north-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Sevenoaks, GTR is the most punctual, at 90.6%.
For GTR, Sevenoaks is the 54th best of 307 ranked stations. Its 90.6% here is 7.7 percentage points above the 82.9% across the whole network.
GTR cancels fewer trains at Sevenoaks than elsewhere: 2.6% of scheduled stops, against 4.7% across its network and 1.8% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,060 | 90.0% | 1.4% |
| Period 6 of 2026-27 | 1,964 | 87.9% | 3.4% |
| Period 5 of 2026-27 | 2,060 | 89.4% | 2.5% |
| Period 4 of 2026-27 | 2,060 | 90.1% | 3.0% |
| Period 3 of 2026-27 | 1,892 | 88.4% | 3.2% |
| Period 2 of 2026-27 | 1,915 | 91.7% | 3.3% |
| Period 1 of 2026-27 | 2,146 | 93.9% | 1.0% |
| Period 13 of 2025-26 | 2,238 | 91.6% | 2.4% |
| Period 12 of 2025-26 | 2,059 | 93.1% | 1.5% |
| Period 11 of 2025-26 | 2,029 | 92.8% | 1.7% |
| Period 10 of 2025-26 | 1,854 | 89.2% | 3.3% |
| Period 9 of 2025-26 | 1,995 | 88.4% | 4.0% |
| Period 8 of 2025-26 | 2,060 | 90.2% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sevenoaks
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 90,721 | 72.3% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out