Southeastern at Sevenoaks
All trains at SevenoaksSoutheastern across BritainSouth East
How this operator is doing here
Southeastern had 90,721 scheduled stops at Sevenoaks in the 13 periods to Period 7 of 2026-27, 78% of the station's total. 72.3% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at Sevenoaks also serve Dunton Green (2.3 km north, 81.6% on time, 1.4% cancelled), Otford (4.2 km north, 80.3% on time, 1.2% cancelled), Kemsing (5.1 km north-east, 81.0% on time, 1.3% cancelled), Shoreham (Kent) (6.2 km north, 97.1% on time, 0.0% cancelled), Hildenborough (7.6 km south-east, 70.3% on time, 2.1% cancelled) and Knockholt (8.5 km north-west, 81.0% on time, 1.4% cancelled), which are the stations on its network closest to Sevenoaks.
Within 30 km of here, Southeastern runs best at Sundridge Park, 18.9 km north-west (99.4%), and worst at Hildenborough, 7.6 km south-east (70.3%).
The busiest Southeastern station within 30 km of Sevenoaks is Lewisham, 25.1 km north-west, with about 461 scheduled stops a day.
Of the 2 operators with enough records at Sevenoaks, Southeastern is the least punctual, at 72.3%.
For Southeastern, Sevenoaks is the 167th best of 173 ranked stations. Its 72.3% here is 11.9 percentage points below the 84.2% across the whole network.
Cancellations of Southeastern at Sevenoaks are near its usual level: 1.6% of scheduled stops, against 1.7% across its network and 1.8% for every operator at the station.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,907 | 61.5% | 1.3% |
| Period 6 of 2026-27 | 6,851 | 55.0% | 1.5% |
| Period 5 of 2026-27 | 7,007 | 70.3% | 2.2% |
| Period 4 of 2026-27 | 6,998 | 76.4% | 1.1% |
| Period 3 of 2026-27 | 7,108 | 74.7% | 2.2% |
| Period 2 of 2026-27 | 6,839 | 78.2% | 1.9% |
| Period 1 of 2026-27 | 7,563 | 79.3% | 1.9% |
| Period 13 of 2025-26 | 7,726 | 77.6% | 1.6% |
| Period 12 of 2025-26 | 7,049 | 77.9% | 1.1% |
| Period 11 of 2025-26 | 6,875 | 76.7% | 1.1% |
| Period 10 of 2025-26 | 5,848 | 72.6% | 1.6% |
| Period 9 of 2025-26 | 6,837 | 66.9% | 1.8% |
| Period 8 of 2025-26 | 7,113 | 70.7% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sevenoaks
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,332 | 90.6% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out