ScotRail had 7,154 scheduled stops at Pitlochry in the 13 periods to Period 7 of 2026-27, 84% of the station's total. 64.5% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
ScotRail trains at Pitlochry also serve Blair Atholl (9.8 km north-west, 53.8% on time, 1.1% cancelled), Dunkeld and Birnam (18.9 km south-east, 67.6% on time, 1.2% cancelled), Perth (39.1 km south-east, 83.5% on time, 1.1% cancelled), Dalwhinnie (40.4 km north-west, 51.9% on time, 1.2% cancelled), Kingussie (46.0 km north-west, 60.5% on time, 1.1% cancelled) and Newtonmore (46.0 km north-west, – on time, 1.0% cancelled), which are the stations on its network closest to Pitlochry.
The busiest ScotRail station within 30 km of Pitlochry is Dunkeld and Birnam, 18.9 km south-east, with about 19 scheduled stops a day.
Of the 2 operators with enough records at Pitlochry, ScotRail is the most punctual, at 64.5%.
For ScotRail, Pitlochry is the 304th best of 312 ranked stations. Its 64.5% here is 23.4 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Pitlochry has got worse each time, from 67.9% within three minutes in 2023-24 to 65.0% in 2024-25 and 62.1% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 552 | 58.2% | 1.1% |
| Period 6 of 2026-27 | 552 | 66.5% | 0.7% |
| Period 5 of 2026-27 | 552 | 69.6% | 2.5% |
| Period 4 of 2026-27 | 552 | 64.0% | 0.7% |
| Period 3 of 2026-27 | 552 | 69.6% | 0.2% |
| Period 2 of 2026-27 | 552 | 73.3% | 0.7% |
| Period 1 of 2026-27 | 636 | 72.4% | 1.4% |
| Period 13 of 2025-26 | 606 | 75.9% | 1.3% |
| Period 12 of 2025-26 | 552 | 72.6% | 0.2% |
| Period 11 of 2025-26 | 546 | 54.6% | 2.9% |
| Period 10 of 2025-26 | 478 | 56.5% | 0.4% |
| Period 9 of 2025-26 | 550 | 54.0% | 0.7% |
| Period 8 of 2025-26 | 474 | 44.9% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Pitlochry
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 710 | 57.3% | 0.7% |
| Caledonian Sleeper | 618 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out