Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER at Pitlochry

All trains at PitlochryLNER across BritainScotland

On time, last 13 periods57.3%Whole station: 63.3%
Cancelled0.7%Whole station: 1.2%
Scheduled stops710Of 8,482 at the station

How this operator is doing here

LNER had 710 scheduled stops at Pitlochry in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 57.3% of recorded arrivals came within three minutes and 0.7% of stops were cancelled.

LNER trains at Pitlochry also serve Blair Atholl (9.8 km north-west, – on time, – cancelled), Dunkeld and Birnam (18.9 km south-east, – on time, – cancelled), Perth (39.1 km south-east, 60.5% on time, 0.4% cancelled), Kingussie (46.0 km north-west, 59.2% on time, 0.7% cancelled), Newtonmore (46.0 km north-west, – on time, – cancelled) and Gleneagles (47.6 km south, 54.0% on time, 0.3% cancelled), which are the stations on its network closest to Pitlochry.

The busiest LNER station within 30 km of Pitlochry is Blair Atholl, 9.8 km north-west, with about 0 scheduled stops a day.

Of the 2 operators with enough records at Pitlochry, LNER is the least punctual, at 57.3%.

LNER cancels fewer trains at Pitlochry than elsewhere: 0.7% of scheduled stops, against 2.9% across its network and 1.2% for every operator at the station.

LNER at Pitlochry has slipped sharply. 57.3% of stops came within three minutes of the timetable in the latest 13 periods, 10.8 percentage points worse than the 68.1% recorded in the 13 before. Cancellations held steady at 0.7% of scheduled stops, against 0.3% before.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 78.6%Period 13 of 2023-24: 73.2%Period 4 of 2024-25: 77.4%Period 8 of 2024-25: 60.7%Period 12 of 2024-25: 76.8%Period 13 of 2024-25: 70.0%Period 2 of 2025-26: 67.9%Period 3 of 2025-26: 73.2%Period 4 of 2025-26: 55.4%Period 6 of 2025-26: 72.7%Period 12 of 2025-26: 60.0%Period 13 of 2025-26: 61.3%Period 1 of 2026-27: 56.7%Period 2 of 2026-27: 57.1%Period 3 of 2026-27: 58.9%Period 4 of 2026-27: 50.0%Period 6 of 2026-27: 55.4%Period 7 of 2026-27: 58.9%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.8%Period 13 of 2023-24: 1.8%Period 4 of 2024-25: 5.4%Period 8 of 2024-25: 0.0%Period 12 of 2024-25: 0.0%Period 13 of 2024-25: 0.0%Period 2 of 2025-26: 0.0%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 0.0%Period 6 of 2025-26: 1.8%Period 12 of 2025-26: 1.8%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 3.2%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 0.0%Period 4 of 2026-27: 0.0%Period 6 of 2026-27: 0.0%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275658.9%0.0%
Period 6 of 2026-275655.4%0.0%
Period 5 of 2026-2755––
Period 4 of 2026-275650.0%0.0%
Period 3 of 2026-275658.9%0.0%
Period 2 of 2026-275657.1%0.0%
Period 1 of 2026-276256.7%3.2%
Period 13 of 2025-266261.3%0.0%
Period 12 of 2025-265660.0%1.8%
Period 11 of 2025-2653––
Period 10 of 2025-2646––
Period 9 of 2025-2655––
Period 8 of 2025-2641––

Other operators at Pitlochry

OperatorScheduled stopsWithin 3 minCancelled
ScotRail7,15464.5%1.1%
Caledonian Sleeper618––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out