Neath
NTHWalesManaged by TfW Rail
How this station is performing
Neath had 31,785 scheduled stops to Period 7 of 2026-27, about 87 a day. 63.2% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Neath opened on 19 June 1850. It was moved to the site it uses now on 20 August 1877. Of the 5 stations nearest to it with a known opening date, Neath is the oldest; the next oldest, Port Talbot Parkway, dates from 1850.
The nearest stations to Neath are Skewen (2.7 km west), Briton Ferry (2.8 km south), Baglan (5.3 km south), Llansamlet (5.4 km west) and Port Talbot Parkway (8.0 km south). 5 stations lie within 10 km in all. Of the five, Port Talbot Parkway is the most punctual at 63.8% and Skewen the least at 58.3%, with Neath on 63.2%.
Neath takes its name from a town called Neath, home to about 50,658 people, and the station stands 0.3 km from its centre.
2 operators call at Neath: Transport for Wales (63.1%, 55% of stops) and Great Western Railway (63.3%, 45% of stops). They are close together, with Great Western Railway leading on 63.3% and Transport for Wales trailing on 63.1%, a gap of 0.2 percentage points.
Compared with 3 stations of a similar size in Wales, Neath is the least punctual, at 63.2%. All of them are ahead, including Barry Island (96.4%), Shotton (73.7%) and Rhyl (76.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 17,331 | 63.1% | 2.8% |
| Great Western Railway | 14,454 | 63.3% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Neath? Delay Repay
These operators call at Neath and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,503 | 63.1% | 2.7% |
| Period 6 of 2026-27 | 2,504 | 61.0% | 2.4% |
| Period 5 of 2026-27 | 2,453 | 55.4% | 4.6% |
| Period 4 of 2026-27 | 2,422 | 60.5% | 3.6% |
| Period 3 of 2026-27 | 2,486 | 65.6% | 2.5% |
| Period 2 of 2026-27 | 2,488 | 66.3% | 2.0% |
| Period 1 of 2026-27 | 2,911 | 68.4% | 2.2% |
| Period 13 of 2025-26 | 2,754 | 70.9% | 1.0% |
| Period 12 of 2025-26 | 2,060 | 71.0% | 1.5% |
| Period 11 of 2025-26 | 1,910 | 69.9% | 1.8% |
| Period 10 of 2025-26 | 2,211 | 60.5% | 3.0% |
| Period 9 of 2025-26 | 2,550 | 50.2% | 3.8% |
| Period 8 of 2025-26 | 2,533 | 59.4% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barry Island | 31,406 | 96.4% | 3.1% |
| Shotton | 31,265 | 73.7% | 2.6% |
| Rhyl | 30,694 | 76.2% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out