Transport for Wales at Neath
How this operator is doing here
Transport for Wales had 17,331 scheduled stops at Neath in the 13 periods to Period 7 of 2026-27, 55% of the station's total. 63.1% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
Transport for Wales trains at Neath also serve Skewen (2.7 km west, 58.3% on time, 2.7% cancelled), Briton Ferry (2.8 km south, 58.6% on time, 2.8% cancelled), Baglan (5.3 km south, 58.3% on time, 2.7% cancelled), Llansamlet (5.4 km west, 60.0% on time, 2.7% cancelled), Port Talbot Parkway (8.0 km south, 64.9% on time, 2.7% cancelled) and Swansea (10.0 km south-west, 72.1% on time, 2.9% cancelled), which are the stations on its network closest to Neath.
Within 30 km of here, Transport for Wales runs best at Treherbert, 18.8 km east (98.1%), and worst at Skewen, 2.7 km west (58.3%).
The busiest Transport for Wales station within 30 km of Neath is Bridgend, 23.6 km south-east, with about 116 scheduled stops a day.
Of the 2 operators with enough records at Neath, Transport for Wales is the least punctual, at 63.1%.
For Transport for Wales, Neath is the 220th best of 228 ranked stations. Its 63.1% here is 21.9 percentage points below the 85.0% across the whole network.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,351 | 61.6% | 2.8% |
| Period 6 of 2026-27 | 1,350 | 61.9% | 2.4% |
| Period 5 of 2026-27 | 1,347 | 57.8% | 4.9% |
| Period 4 of 2026-27 | 1,388 | 59.8% | 5.4% |
| Period 3 of 2026-27 | 1,370 | 65.6% | 2.6% |
| Period 2 of 2026-27 | 1,360 | 65.7% | 2.4% |
| Period 1 of 2026-27 | 1,568 | 67.3% | 2.4% |
| Period 13 of 2025-26 | 1,509 | 72.5% | 1.3% |
| Period 12 of 2025-26 | 1,126 | 70.4% | 1.8% |
| Period 11 of 2025-26 | 1,021 | 71.9% | 2.3% |
| Period 10 of 2025-26 | 1,209 | 61.4% | 2.0% |
| Period 9 of 2025-26 | 1,370 | 48.0% | 3.5% |
| Period 8 of 2025-26 | 1,362 | 57.7% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Neath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,454 | 63.3% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out