Barry Island
BYIWalesManaged by TfW Rail
How this station is performing
Barry Island had 31,406 scheduled stops to Period 7 of 2026-27, about 86 a day. 96.4% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Barry Island opened on 3 August 1896, 130 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Barry Docks is the oldest (1888) and Rhoose Cardiff International Airport the newest (1897), with Barry Island in between.
The nearest stations to Barry Island are Barry (0.9 km north-west), Barry Docks (1.5 km north-east), Cadoxton (2.8 km north-east), Rhoose Cardiff International Airport (5.3 km west) and Dinas Powys (5.8 km north-east). 9 stations lie within 10 km in all. At 96.4%, Barry Island is more punctual than every one of them; the best of the five, Barry, manages 93.4%.
Barry Island takes its name from a seaside resort called Barry Island, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Barry Island was Period 3 of 2023-24, at 73.7%, some time before the latest year. The strongest was Period 11 of 2025-26, at 98.3%, and the two are 24.6 percentage points apart. Cancellations peaked at 10.9% of scheduled stops in Period 1 of 2023-24, against 3.1% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Barry Island is the most punctual, at 96.4%. The comparison group includes Shotton (73.7%), Neath (63.2%) and Rhyl (76.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 31,406 | 96.4% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Barry Island? Delay Repay
These operators call at Barry Island and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,359 | 96.6% | 2.2% |
| Period 6 of 2026-27 | 2,406 | 96.5% | 1.1% |
| Period 5 of 2026-27 | 2,447 | 96.8% | 2.9% |
| Period 4 of 2026-27 | 2,354 | 96.0% | 3.0% |
| Period 3 of 2026-27 | 2,374 | 96.3% | 2.8% |
| Period 2 of 2026-27 | 2,430 | 97.2% | 4.4% |
| Period 1 of 2026-27 | 2,764 | 97.7% | 3.5% |
| Period 13 of 2025-26 | 2,630 | 97.6% | 4.0% |
| Period 12 of 2025-26 | 2,402 | 97.8% | 1.4% |
| Period 11 of 2025-26 | 2,332 | 98.3% | 4.0% |
| Period 10 of 2025-26 | 2,117 | 94.9% | 4.2% |
| Period 9 of 2025-26 | 2,402 | 92.7% | 4.1% |
| Period 8 of 2025-26 | 2,389 | 94.6% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out