Rhyl
RHLWalesManaged by TfW Rail
How this station is performing
Rhyl had 30,694 scheduled stops to Period 7 of 2026-27, about 84 a day. 76.2% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Rhyl opened on 1 May 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Rhyl is the oldest; the next oldest, Prestatyn, dates from 1848.
The nearest stations to Rhyl are Prestatyn (5.8 km east), Abergele and Pensarn (6.8 km south-west), Colwyn Bay (15.9 km west), West Kirby (21.2 km east) and Glan Conwy (21.2 km west). 2 stations lie within 10 km in all. Of the five, West Kirby is the most punctual at 93.2% and Glan Conwy the least at 75.1%, with Rhyl on 76.2%.
Rhyl takes its name from a seaside resort called Rhyl, home to about 27,060 people, and the station stands 0.7 km from its centre.
2 operators call at Rhyl: Transport for Wales (76.9%, 84% of stops) and Avanti (72.3%, 16% of stops). They are close together, with Transport for Wales leading on 76.9% and Avanti trailing on 72.3%, a gap of 4.6 percentage points.
1 of 3 stations of a similar size in Wales are more punctual than Rhyl on 76.2%. The comparison group includes Colwyn Bay (79.8%), Prestatyn (75.2%) and Flint (74.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 25,919 | 76.9% | 2.0% |
| Avanti | 4,775 | 72.3% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Rhyl? Delay Repay
These operators call at Rhyl and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,772 | 79.1% | 1.5% |
| Period 6 of 2026-27 | 2,782 | 69.3% | 2.9% |
| Period 5 of 2026-27 | 2,679 | 73.1% | 2.7% |
| Period 4 of 2026-27 | 2,708 | 74.0% | 2.7% |
| Period 3 of 2026-27 | 2,533 | 75.3% | 2.8% |
| Period 2 of 2026-27 | 2,425 | 72.3% | 2.3% |
| Period 1 of 2026-27 | 2,401 | 81.3% | 1.7% |
| Period 13 of 2025-26 | 2,282 | 83.6% | 1.7% |
| Period 12 of 2025-26 | 2,082 | 83.8% | 1.2% |
| Period 11 of 2025-26 | 2,029 | 83.5% | 2.5% |
| Period 10 of 2025-26 | 1,891 | 79.4% | 1.9% |
| Period 9 of 2025-26 | 2,068 | 66.7% | 2.1% |
| Period 8 of 2025-26 | 2,042 | 70.8% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Colwyn Bay | 30,645 | 79.8% | 2.2% |
| Prestatyn | 30,643 | 75.2% | 2.1% |
| Flint | 30,273 | 74.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out