Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Great Western Railway at Neath

All trains at NeathGreat Western Railway across BritainWales

On time, last 13 periods63.3%Whole station: 63.2%
Cancelled2.3%Whole station: 2.6%
Scheduled stops14,454Of 31,785 at the station

How this operator is doing here

Great Western Railway had 14,454 scheduled stops at Neath in the 13 periods to Period 7 of 2026-27, 45% of the station's total. 63.3% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.

Great Western Railway trains at Neath also serve Port Talbot Parkway (8.0 km south, 62.4% on time, 2.3% cancelled), Swansea (10.0 km south-west, 64.0% on time, 2.5% cancelled), Bridgend (23.6 km south-east, 61.2% on time, 2.2% cancelled), Llanelli (24.4 km west, 76.0% on time, 6.0% cancelled), Pembrey and Burry Port (30.6 km west, 76.6% on time, 6.0% cancelled) and Kidwelly (36.0 km west, – on time, – cancelled), which are the stations on its network closest to Neath.

Within 30 km of here, Great Western Railway runs best at Llanelli, 24.4 km west (76.0%), and worst at Bridgend, 23.6 km south-east (61.2%).

The busiest Great Western Railway station within 30 km of Neath is Port Talbot Parkway, 8.0 km south, with about 41 scheduled stops a day.

Of the 2 operators with enough records at Neath, Great Western Railway is the most punctual, at 63.3%.

For Great Western Railway, Neath is the 186th best of 210 ranked stations. Its 63.3% here is 12.4 percentage points below the 75.7% across the whole network.

Period by period

50%60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 66.0%Period 2 of 2023-24: 61.7%Period 3 of 2023-24: 62.0%Period 4 of 2023-24: 64.8%Period 5 of 2023-24: 63.3%Period 6 of 2023-24: 61.6%Period 7 of 2023-24: 63.8%Period 8 of 2023-24: 60.0%Period 9 of 2023-24: 53.0%Period 10 of 2023-24: 53.1%Period 11 of 2023-24: 66.2%Period 12 of 2023-24: 60.8%Period 13 of 2023-24: 59.3%Period 1 of 2024-25: 71.5%Period 2 of 2024-25: 68.5%Period 3 of 2024-25: 69.6%Period 4 of 2024-25: 62.0%Period 5 of 2024-25: 69.5%Period 6 of 2024-25: 67.2%Period 7 of 2024-25: 63.8%Period 8 of 2024-25: 59.7%Period 9 of 2024-25: 57.6%Period 10 of 2024-25: 62.7%Period 11 of 2024-25: 66.5%Period 12 of 2024-25: 68.7%Period 13 of 2024-25: 66.8%Period 1 of 2025-26: 69.3%Period 2 of 2025-26: 66.8%Period 3 of 2025-26: 64.6%Period 4 of 2025-26: 63.5%Period 5 of 2025-26: 66.5%Period 6 of 2025-26: 67.9%Period 7 of 2025-26: 61.7%Period 8 of 2025-26: 61.3%Period 9 of 2025-26: 52.8%Period 10 of 2025-26: 59.5%Period 11 of 2025-26: 67.5%Period 12 of 2025-26: 71.8%Period 13 of 2025-26: 68.9%Period 1 of 2026-27: 69.7%Period 2 of 2026-27: 66.9%Period 3 of 2026-27: 65.6%Period 4 of 2026-27: 61.5%Period 5 of 2026-27: 52.6%Period 6 of 2026-27: 60.0%Period 7 of 2026-27: 64.9%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 2.4%Period 2 of 2023-24: 4.0%Period 3 of 2023-24: 2.2%Period 4 of 2023-24: 2.8%Period 5 of 2023-24: 3.1%Period 6 of 2023-24: 1.4%Period 7 of 2023-24: 2.2%Period 8 of 2023-24: 3.5%Period 9 of 2023-24: 3.7%Period 10 of 2023-24: 5.0%Period 11 of 2023-24: 2.2%Period 12 of 2023-24: 4.3%Period 13 of 2023-24: 1.6%Period 1 of 2024-25: 3.3%Period 2 of 2024-25: 2.6%Period 3 of 2024-25: 2.5%Period 4 of 2024-25: 2.7%Period 5 of 2024-25: 1.6%Period 6 of 2024-25: 1.6%Period 7 of 2024-25: 4.1%Period 8 of 2024-25: 4.3%Period 9 of 2024-25: 7.9%Period 10 of 2024-25: 4.4%Period 11 of 2024-25: 2.3%Period 12 of 2024-25: 1.1%Period 13 of 2024-25: 2.5%Period 1 of 2025-26: 1.8%Period 2 of 2025-26: 2.9%Period 3 of 2025-26: 2.3%Period 4 of 2025-26: 1.7%Period 5 of 2025-26: 1.2%Period 6 of 2025-26: 1.9%Period 7 of 2025-26: 1.5%Period 8 of 2025-26: 2.6%Period 9 of 2025-26: 4.2%Period 10 of 2025-26: 4.3%Period 11 of 2025-26: 1.3%Period 12 of 2025-26: 1.1%Period 13 of 2025-26: 0.7%Period 1 of 2026-27: 2.0%Period 2 of 2026-27: 1.7%Period 3 of 2026-27: 2.3%Period 4 of 2026-27: 1.1%Period 5 of 2026-27: 4.2%Period 6 of 2026-27: 2.4%Period 7 of 2026-27: 2.5%2023-242024-252025-262026-27

See how Great Western Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,15264.9%2.5%
Period 6 of 2026-271,15460.0%2.4%
Period 5 of 2026-271,10652.6%4.2%
Period 4 of 2026-271,03461.5%1.1%
Period 3 of 2026-271,11665.6%2.3%
Period 2 of 2026-271,12866.9%1.7%
Period 1 of 2026-271,34369.7%2.0%
Period 13 of 2025-261,24568.9%0.7%
Period 12 of 2025-2693471.8%1.1%
Period 11 of 2025-2688967.5%1.3%
Period 10 of 2025-261,00259.5%4.3%
Period 9 of 2025-261,18052.8%4.2%
Period 8 of 2025-261,17161.3%2.6%

Time of year

50%60%70%80%90%P1: 69.1%1P2: 66.0%2P3: 65.6%3P4: 63.0%4P5: 63.2%5P6: 64.3%6P7: 63.5%7P8: 60.4%8P9: 54.4%9P10: 58.5%10P11: 66.7%11P12: 67.0%12P13: 65.2%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Neath

OperatorScheduled stopsWithin 3 minCancelled
Transport for Wales17,33163.1%2.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out