Shotton
SHTWalesManaged by TfW Rail
How this station is performing
Shotton had 31,265 scheduled stops to Period 7 of 2026-27, about 86 a day. 73.7% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Shotton opened on 1 October 1891, 135 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Flint is the oldest (1848) and Hawarden Bridge the newest (1924), with Shotton in between.
The nearest stations to Shotton are Hawarden Bridge (0.6 km north-east), Hawarden (3.2 km south), Buckley (5.8 km south), Flint (7.5 km north-west) and Penyffordd (8.0 km south). 8 stations lie within 10 km in all. Of the five, Penyffordd is the most punctual at 81.4% and Hawarden Bridge the least at 73.6%, with Shotton on 73.7%.
Shotton is one of 4 stations named after a town called Shotton, home to about 6,663 people; this one stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Shotton was Period 3 of 2023-24, at 53.4%, some time before the latest year. The strongest was Period 13 of 2023-24, at 82.5%, and the two are 29.1 percentage points apart. Cancellations peaked at 8.2% of scheduled stops in Period 1 of 2023-24, against 2.6% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Shotton on 73.7%. The comparison group includes Barry Island (96.4%), Neath (63.2%) and Rhyl (76.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 31,265 | 73.7% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Shotton? Delay Repay
These operators call at Shotton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,721 | 74.3% | 1.9% |
| Period 6 of 2026-27 | 2,439 | 68.0% | 3.3% |
| Period 5 of 2026-27 | 2,446 | 70.7% | 3.1% |
| Period 4 of 2026-27 | 2,720 | 75.7% | 2.9% |
| Period 3 of 2026-27 | 2,598 | 74.2% | 4.5% |
| Period 2 of 2026-27 | 2,482 | 72.9% | 2.1% |
| Period 1 of 2026-27 | 2,594 | 77.0% | 1.9% |
| Period 13 of 2025-26 | 2,466 | 80.0% | 1.6% |
| Period 12 of 2025-26 | 2,247 | 81.1% | 1.8% |
| Period 11 of 2025-26 | 2,132 | 79.2% | 3.1% |
| Period 10 of 2025-26 | 2,054 | 71.0% | 3.8% |
| Period 9 of 2025-26 | 2,189 | 63.0% | 2.7% |
| Period 8 of 2025-26 | 2,177 | 69.5% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barry Island | 31,406 | 96.4% | 3.1% |
| Neath | 31,785 | 63.2% | 2.6% |
| Rhyl | 30,694 | 76.2% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out