Montrose
MTSScotlandManaged by ScotRail
How this station is performing
Montrose had 29,667 scheduled stops to Period 7 of 2026-27, about 82 a day. 74.9% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Montrose opened on 1 October 1881, 145 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Carnoustie is the oldest (1838) and Golf Street the newest (1960), with Montrose in between.
Montrose is remote: its nearest neighbours are Laurencekirk (13.8 km north), Arbroath (18.5 km south-west), Carnoustie (27.6 km south-west), Golf Street (28.3 km south-west) and Barry Links (29.6 km south-west). Of the five, Laurencekirk is the most punctual at 82.4% and Carnoustie the least at 69.0%, with Montrose on 74.9%.
Montrose is one of 2 stations named after a town called Montrose, home to about 12,100 people; this one stands 0.6 km from its centre.
4 operators call at Montrose: ScotRail (76.1%, 87% of stops), LNER (63.0%, 9% of stops), CrossCountry (76.3%, 3% of stops) and Caledonian Sleeper (–, 1% of stops). The operator you travel with matters: CrossCountry reaches 76.3% within three minutes while LNER manages 63.0%, a gap of 13.3 percentage points.
Compared with 3 stations of a similar size in Scotland, Montrose is the least punctual, at 74.9%. All of them are ahead, including Barrhead (91.2%), Bishopbriggs (92.1%) and Lenzie (90.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,932 | 76.1% | 1.8% |
| LNER | 2,669 | 63.0% | 1.8% |
| CrossCountry | 781 | 76.3% | 10.9% |
| Caledonian Sleeper | 285 | – | – |
Operators with their own page for this station are linked to it.
Late train at Montrose? Delay Repay
These operators call at Montrose and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Caledonian Sleeper: pays for a delay of 30 minutes or more
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,320 | 75.6% | 1.3% |
| Period 6 of 2026-27 | 2,341 | 82.2% | 1.4% |
| Period 5 of 2026-27 | 2,341 | 75.5% | 3.5% |
| Period 4 of 2026-27 | 2,344 | 79.3% | 1.3% |
| Period 3 of 2026-27 | 2,332 | 79.8% | 1.9% |
| Period 2 of 2026-27 | 2,320 | 81.5% | 1.6% |
| Period 1 of 2026-27 | 2,646 | 74.3% | 2.3% |
| Period 13 of 2025-26 | 2,517 | 72.2% | 1.7% |
| Period 12 of 2025-26 | 1,982 | 65.3% | 2.1% |
| Period 11 of 2025-26 | 2,038 | 66.5% | 2.7% |
| Period 10 of 2025-26 | 1,967 | 73.2% | 3.6% |
| Period 9 of 2025-26 | 2,260 | 72.9% | 1.9% |
| Period 8 of 2025-26 | 2,259 | 71.9% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barrhead | 29,680 | 91.2% | 1.7% |
| Bishopbriggs | 29,455 | 92.1% | 0.8% |
| Lenzie | 29,953 | 90.9% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out