Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Montrose

All trains at MontroseCrossCountry across BritainScotland

On time, last 13 periods76.3%Whole station: 74.9%
Cancelled10.9%Whole station: 2.1%
Scheduled stops781Of 29,667 at the station

How this operator is doing here

CrossCountry had 781 scheduled stops at Montrose in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 76.3% of recorded arrivals came within three minutes and 10.9% of stops were cancelled.

CrossCountry trains at Montrose also serve Laurencekirk (13.8 km north, – on time, – cancelled), Arbroath (18.5 km south-west, 73.7% on time, 10.6% cancelled), Stonehaven (32.0 km north-east, 85.4% on time, 11.1% cancelled), Dundee (41.8 km south-west, 66.8% on time, 13.5% cancelled), Leuchars (For St. Andrews) (45.6 km south-west, 54.3% on time, 13.6% cancelled) and Aberdeen (52.9 km north-east, 76.1% on time, 15.6% cancelled), which are the stations on its network closest to Montrose.

The busiest CrossCountry station within 30 km of Montrose is Arbroath, 18.5 km south-west, with about 2 scheduled stops a day.

Of the 3 operators with enough records at Montrose, CrossCountry is the most punctual, at 76.3%.

CrossCountry cancels more at Montrose than elsewhere: 10.9% of scheduled stops, against 5.9% across its network and 2.1% for every operator at the station.

Alongside CrossCountry, the other operators at Montrose are ScotRail (76.1%, 87% of stops), LNER (63.0%, 9% of stops) and Caledonian Sleeper (–, 1% of stops), so passengers here can compare several services.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 12 of 2025-26: 61.1%Period 13 of 2025-26: 68.1%Period 1 of 2026-27: 75.4%Period 2 of 2026-27: 79.7%Period 3 of 2026-27: 84.7%Period 4 of 2026-27: 84.3%Period 5 of 2026-27: 74.6%Period 6 of 2026-27: 80.3%
This pageGreat Britain
0%10%20%30%Period 12 of 2025-26: 8.5%Period 13 of 2025-26: 8.0%Period 1 of 2026-27: 20.8%Period 2 of 2026-27: 18.1%Period 3 of 2026-27: 11.9%Period 4 of 2026-27: 7.9%Period 5 of 2026-27: 6.6%Period 6 of 2026-27: 5.3%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2754––
Period 6 of 2026-277580.3%5.3%
Period 5 of 2026-277674.6%6.6%
Period 4 of 2026-277684.3%7.9%
Period 3 of 2026-276784.7%11.9%
Period 2 of 2026-277279.7%18.1%
Period 1 of 2026-277775.4%20.8%
Period 13 of 2025-267568.1%8.0%
Period 12 of 2025-265961.1%8.5%
Period 11 of 2025-2648––
Period 10 of 2025-2647––
Period 9 of 2025-2628––
Period 8 of 2025-2627––

Other operators at Montrose

OperatorScheduled stopsWithin 3 minCancelled
ScotRail25,93276.1%1.8%
LNER2,66963.0%1.8%
Caledonian Sleeper285––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out