CrossCountry had 781 scheduled stops at Montrose in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 76.3% of recorded arrivals came within three minutes and 10.9% of stops were cancelled.
CrossCountry trains at Montrose also serve Laurencekirk (13.8 km north, – on time, – cancelled), Arbroath (18.5 km south-west, 73.7% on time, 10.6% cancelled), Stonehaven (32.0 km north-east, 85.4% on time, 11.1% cancelled), Dundee (41.8 km south-west, 66.8% on time, 13.5% cancelled), Leuchars (For St. Andrews) (45.6 km south-west, 54.3% on time, 13.6% cancelled) and Aberdeen (52.9 km north-east, 76.1% on time, 15.6% cancelled), which are the stations on its network closest to Montrose.
The busiest CrossCountry station within 30 km of Montrose is Arbroath, 18.5 km south-west, with about 2 scheduled stops a day.
Of the 3 operators with enough records at Montrose, CrossCountry is the most punctual, at 76.3%.
CrossCountry cancels more at Montrose than elsewhere: 10.9% of scheduled stops, against 5.9% across its network and 2.1% for every operator at the station.
Alongside CrossCountry, the other operators at Montrose are ScotRail (76.1%, 87% of stops), LNER (63.0%, 9% of stops) and Caledonian Sleeper (–, 1% of stops), so passengers here can compare several services.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 54 | – | – |
| Period 6 of 2026-27 | 75 | 80.3% | 5.3% |
| Period 5 of 2026-27 | 76 | 74.6% | 6.6% |
| Period 4 of 2026-27 | 76 | 84.3% | 7.9% |
| Period 3 of 2026-27 | 67 | 84.7% | 11.9% |
| Period 2 of 2026-27 | 72 | 79.7% | 18.1% |
| Period 1 of 2026-27 | 77 | 75.4% | 20.8% |
| Period 13 of 2025-26 | 75 | 68.1% | 8.0% |
| Period 12 of 2025-26 | 59 | 61.1% | 8.5% |
| Period 11 of 2025-26 | 48 | – | – |
| Period 10 of 2025-26 | 47 | – | – |
| Period 9 of 2025-26 | 28 | – | – |
| Period 8 of 2025-26 | 27 | – | – |
Other operators at Montrose
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,932 | 76.1% | 1.8% |
| LNER | 2,669 | 63.0% | 1.8% |
| Caledonian Sleeper | 285 | – | – |