Barrhead
BRRScotlandManaged by ScotRail
How this station is performing
Barrhead had 29,680 scheduled stops to Period 7 of 2026-27, about 82 a day. 91.2% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Barrhead opened on 27 September 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barrhead is the oldest; the next oldest, Nitshill, dates from 1848.
The nearest stations to Barrhead are Nitshill (2.5 km east), Neilston (3.0 km south-west), Priesthill and Darnley (3.5 km east), Patterton (4.2 km east) and Hawkhead (4.2 km north). 46 stations lie within 10 km in all. At 91.2%, Barrhead is less punctual than all of them; the best of the five, Neilston, manages 97.6%.
Barrhead takes its name from a town called Barrhead, home to about 17,610 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Barrhead was Period 8 of 2024-25, at 82.9%, some time before the latest year. The strongest was Period 6 of 2026-27, at 95.3%, and the two are 12.4 percentage points apart. Cancellations peaked at 5.0% of scheduled stops in Period 3 of 2026-27, against 1.7% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Barrhead on 91.2%. The comparison group includes Montrose (74.9%), Bishopbriggs (92.1%) and Lenzie (90.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 29,680 | 91.2% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Barrhead? Delay Repay
These operators call at Barrhead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,359 | 93.3% | 1.1% |
| Period 6 of 2026-27 | 2,113 | 95.3% | 0.8% |
| Period 5 of 2026-27 | 2,360 | 91.6% | 1.1% |
| Period 4 of 2026-27 | 2,346 | 89.9% | 1.7% |
| Period 3 of 2026-27 | 2,360 | 92.4% | 5.0% |
| Period 2 of 2026-27 | 2,234 | 93.0% | 1.5% |
| Period 1 of 2026-27 | 2,726 | 90.9% | 1.9% |
| Period 13 of 2025-26 | 1,762 | 92.6% | 1.1% |
| Period 12 of 2025-26 | 2,352 | 94.1% | 0.5% |
| Period 11 of 2025-26 | 2,349 | 92.8% | 1.2% |
| Period 10 of 2025-26 | 2,023 | 85.4% | 1.5% |
| Period 9 of 2025-26 | 2,344 | 85.8% | 2.9% |
| Period 8 of 2025-26 | 2,352 | 89.0% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Montrose | 29,667 | 74.9% | 2.1% |
| Bishopbriggs | 29,455 | 92.1% | 0.8% |
| Lenzie | 29,953 | 90.9% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out