ScotRail at Montrose
How this operator is doing here
ScotRail had 25,932 scheduled stops at Montrose in the 13 periods to Period 7 of 2026-27, 87% of the station's total. 76.1% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
ScotRail trains at Montrose also serve Laurencekirk (13.8 km north, 82.4% on time, 2.2% cancelled), Arbroath (18.5 km south-west, 71.8% on time, 1.7% cancelled), Carnoustie (27.6 km south-west, 68.9% on time, 1.9% cancelled), Golf Street (28.3 km south-west, – on time, 3.7% cancelled), Barry Links (29.6 km south-west, – on time, 3.7% cancelled) and Stonehaven (32.0 km north-east, 81.2% on time, 1.9% cancelled), which are the stations on its network closest to Montrose.
Within 30 km of here, ScotRail runs best at Laurencekirk, 13.8 km north (82.4%), and worst at Carnoustie, 27.6 km south-west (68.9%).
The busiest ScotRail station within 30 km of Montrose is Arbroath, 18.5 km south-west, with about 67 scheduled stops a day.
ScotRail ranks 2nd of the 3 operators with enough records at Montrose, on 76.1%.
For ScotRail, Montrose is the 286th best of 312 ranked stations. Its 76.1% here is 11.8 percentage points below the 87.9% across the whole network.
ScotRail at Montrose has not moved in one direction over three full railway years: 73.0% within three minutes in 2023-24, 72.9% in 2024-25 and 75.7% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,036 | 77.0% | 1.1% |
| Period 6 of 2026-27 | 2,035 | 84.5% | 1.2% |
| Period 5 of 2026-27 | 2,033 | 77.4% | 3.4% |
| Period 4 of 2026-27 | 2,036 | 81.0% | 1.2% |
| Period 3 of 2026-27 | 2,036 | 81.6% | 1.6% |
| Period 2 of 2026-27 | 2,018 | 83.2% | 1.0% |
| Period 1 of 2026-27 | 2,311 | 76.0% | 1.7% |
| Period 13 of 2025-26 | 2,188 | 73.3% | 1.5% |
| Period 12 of 2025-26 | 1,728 | 66.0% | 1.9% |
| Period 11 of 2025-26 | 1,790 | 67.2% | 2.0% |
| Period 10 of 2025-26 | 1,721 | 74.5% | 3.1% |
| Period 9 of 2025-26 | 2,000 | 72.9% | 1.8% |
| Period 8 of 2025-26 | 2,000 | 71.8% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Montrose
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 2,669 | 63.0% | 1.8% |
| CrossCountry | 781 | 76.3% | 10.9% |
| Caledonian Sleeper | 285 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out