Perth
PTHScotlandManaged by ScotRail
How this station is performing
Perth had 43,264 scheduled stops to Period 7 of 2026-27, about 119 a day. 82.7% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Perth opened on 23 May 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ladybank is the oldest (1847) and Gleneagles the newest (1856), with Perth in between.
Perth is remote: its nearest neighbours are Dunkeld and Birnam (20.2 km north-west), Gleneagles (22.2 km south-west), Ladybank (23.5 km south-east), Invergowrie (24.5 km east) and Springfield (26.1 km south-east). Of the five, Springfield is the most punctual at 83.3% and Dunkeld and Birnam the least at 66.3%, with Perth on 82.7%.
Perth takes its name from a city called Perth, home to about 47,430 people, and the station stands 0.6 km from its centre.
3 operators call at Perth: ScotRail (83.5%, 97% of stops), LNER (60.5%, 2% of stops) and Caledonian Sleeper (–, 1% of stops). The operator you travel with matters: ScotRail reaches 83.5% within three minutes while LNER manages 60.5%, a gap of 23.0 percentage points.
Compared with 3 stations of a similar size in Scotland, Perth is the least punctual, at 82.7%. All of them are ahead, including Easterhouse (88.8%), Garrowhill (88.2%) and Crossmyloof (95.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 41,915 | 83.5% | 1.1% |
| LNER | 731 | 60.5% | 0.4% |
| Caledonian Sleeper | 618 | – | – |
Operators with their own page for this station are linked to it.
Late train at Perth? Delay Repay
These operators call at Perth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,299 | 79.5% | 0.7% |
| Period 6 of 2026-27 | 3,299 | 85.8% | 1.4% |
| Period 5 of 2026-27 | 3,303 | 81.7% | 2.3% |
| Period 4 of 2026-27 | 3,306 | 83.4% | 0.9% |
| Period 3 of 2026-27 | 3,302 | 85.0% | 1.1% |
| Period 2 of 2026-27 | 3,304 | 87.4% | 0.8% |
| Period 1 of 2026-27 | 3,821 | 82.7% | 1.1% |
| Period 13 of 2025-26 | 3,568 | 84.4% | 1.0% |
| Period 12 of 2025-26 | 3,204 | 83.2% | 0.5% |
| Period 11 of 2025-26 | 3,293 | 79.4% | 1.6% |
| Period 10 of 2025-26 | 2,879 | 80.5% | 1.0% |
| Period 9 of 2025-26 | 3,347 | 81.5% | 1.6% |
| Period 8 of 2025-26 | 3,339 | 80.2% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Easterhouse | 43,469 | 88.8% | 1.9% |
| Garrowhill | 43,469 | 88.2% | 1.9% |
| Crossmyloof | 43,917 | 95.8% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out