LNER at Kirkcaldy
How this operator is doing here
LNER had 2,568 scheduled stops at Kirkcaldy in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 61.6% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
LNER trains at Kirkcaldy also serve Inverkeithing (16.5 km south-west, 55.4% on time, 1.6% cancelled), Edinburgh (17.9 km south, 72.5% on time, 2.4% cancelled), Haymarket (18.8 km south, 51.2% on time, 1.3% cancelled), Leuchars (For St. Andrews) (33.7 km north-east, 61.0% on time, 1.6% cancelled), Perth (35.3 km north-west, 60.5% on time, 0.4% cancelled) and Gleneagles (39.3 km north-west, 54.0% on time, 0.3% cancelled), which are the stations on its network closest to Kirkcaldy.
The busiest LNER station within 30 km of Kirkcaldy is Edinburgh, 17.9 km south, with about 61 scheduled stops a day.
LNER ranks 2nd of the 3 operators with enough records at Kirkcaldy, on 61.6%.
For LNER, Kirkcaldy is the 30th best of 35 ranked stations. Its 61.6% here is 6.0 percentage points below the 67.6% across the whole network.
LNER at Kirkcaldy has slipped sharply. 61.6% of stops came within three minutes of the timetable in the latest 13 periods, 14.0 percentage points worse than the 75.6% recorded in the 13 before. Cancellations rose to 1.7% of scheduled stops from 0.7%, which is 1.0 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 150 | 62.7% | 0.0% |
| Period 6 of 2026-27 | 208 | 61.8% | 1.9% |
| Period 5 of 2026-27 | 208 | 53.2% | 1.4% |
| Period 4 of 2026-27 | 208 | 55.6% | 0.5% |
| Period 3 of 2026-27 | 208 | 57.8% | 1.9% |
| Period 2 of 2026-27 | 206 | 64.1% | 0.0% |
| Period 1 of 2026-27 | 235 | 55.2% | 2.1% |
| Period 13 of 2025-26 | 228 | 69.0% | 0.9% |
| Period 12 of 2025-26 | 194 | 62.6% | 2.1% |
| Period 11 of 2025-26 | 127 | 53.0% | 7.9% |
| Period 10 of 2025-26 | 180 | 56.5% | 1.7% |
| Period 9 of 2025-26 | 208 | 73.2% | 1.4% |
| Period 8 of 2025-26 | 208 | 72.1% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Kirkcaldy
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 37,231 | 79.8% | 1.4% |
| CrossCountry | 693 | 48.0% | 13.6% |
| Caledonian Sleeper | 44 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out