Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Kirkcaldy

All trains at KirkcaldyCrossCountry across BritainScotland

On time, last 13 periods48.0%Whole station: 78.2%
Cancelled13.6%Whole station: 1.6%
Scheduled stops693Of 40,536 at the station

How this operator is doing here

CrossCountry had 693 scheduled stops at Kirkcaldy in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 48.0% of recorded arrivals came within three minutes and 13.6% of stops were cancelled.

CrossCountry trains at Kirkcaldy also serve Markinch (10.1 km north, 47.1% on time, 13.6% cancelled), Inverkeithing (16.5 km south-west, 46.9% on time, 13.6% cancelled), Edinburgh (17.9 km south, 70.3% on time, 4.2% cancelled), Ladybank (18.3 km north, 49.4% on time, 13.6% cancelled), Haymarket (18.8 km south, 65.0% on time, 11.4% cancelled) and Cupar (24.8 km north-east, 51.2% on time, 13.6% cancelled), which are the stations on its network closest to Kirkcaldy.

The busiest CrossCountry station within 30 km of Kirkcaldy is Edinburgh, 17.9 km south, with about 29 scheduled stops a day.

Of the 3 operators with enough records at Kirkcaldy, CrossCountry is the least punctual, at 48.0%.

CrossCountry cancels more at Kirkcaldy than elsewhere: 13.6% of scheduled stops, against 5.9% across its network and 1.6% for every operator at the station.

CrossCountry at Kirkcaldy has slipped sharply. 48.0% of stops came within three minutes of the timetable in the latest 13 periods, 26.6 percentage points worse than the 74.6% recorded in the 13 before. Cancellations rose to 13.6% of scheduled stops from 9.8%, which is 3.8 percentage points more.

Period by period

40%60%80%2023-242024-252025-262026-27Period 13 of 2023-24: 61.8%Period 3 of 2024-25: 54.9%Period 4 of 2024-25: 49.0%Period 9 of 2024-25: 62.2%Period 12 of 2024-25: 85.2%Period 13 of 2024-25: 86.8%Period 2 of 2025-26: 69.8%Period 3 of 2025-26: 68.6%Period 4 of 2025-26: 68.6%Period 7 of 2025-26: 78.4%Period 9 of 2025-26: 38.5%Period 12 of 2025-26: 48.1%Period 13 of 2025-26: 54.2%Period 1 of 2026-27: 56.5%Period 2 of 2026-27: 55.8%Period 4 of 2026-27: 44.0%Period 5 of 2026-27: 38.5%Period 6 of 2026-27: 50.0%
This pageGreat Britain
0%10%20%30%Period 13 of 2023-24: 3.4%Period 3 of 2024-25: 8.9%Period 4 of 2024-25: 12.5%Period 9 of 2024-25: 19.6%Period 12 of 2024-25: 3.6%Period 13 of 2024-25: 11.7%Period 2 of 2025-26: 5.4%Period 3 of 2025-26: 8.9%Period 4 of 2025-26: 8.9%Period 7 of 2025-26: 10.5%Period 9 of 2025-26: 7.1%Period 12 of 2025-26: 7.1%Period 13 of 2025-26: 6.3%Period 1 of 2026-27: 28.1%Period 2 of 2026-27: 23.2%Period 4 of 2026-27: 10.7%Period 5 of 2026-27: 7.1%Period 6 of 2026-27: 17.9%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2740––
Period 6 of 2026-275650.0%17.9%
Period 5 of 2026-275638.5%7.1%
Period 4 of 2026-275644.0%10.7%
Period 3 of 2026-2750––
Period 2 of 2026-275655.8%23.2%
Period 1 of 2026-276456.5%28.1%
Period 13 of 2025-266354.2%6.3%
Period 12 of 2025-265648.1%7.1%
Period 11 of 2025-2638––
Period 10 of 2025-2648––
Period 9 of 2025-265638.5%7.1%
Period 8 of 2025-2654––

Other operators at Kirkcaldy

OperatorScheduled stopsWithin 3 minCancelled
ScotRail37,23179.8%1.4%
LNER2,56861.6%1.7%
Caledonian Sleeper44––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out