Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER at Inverness

All trains at InvernessLNER across BritainScotland

On time, last 13 periods79.2%Whole station: 87.1%
Cancelled0.7%Whole station: 2.1%
Scheduled stops710Of 28,851 at the station

How this operator is doing here

LNER had 710 scheduled stops at Inverness in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 79.2% of recorded arrivals came within three minutes and 0.7% of stops were cancelled.

LNER trains at Inverness also serve Carrbridge (32.5 km south-east, – on time, – cancelled), Aviemore (40.2 km south-east, 68.0% on time, 0.7% cancelled), Kingussie (45.9 km south, 59.2% on time, 0.7% cancelled), Newtonmore (47.2 km south, – on time, – cancelled), Blair Atholl (82.6 km south, – on time, – cancelled) and Pitlochry (91.3 km south, 57.3% on time, 0.7% cancelled), which are the stations on its network closest to Inverness.

Of the 2 operators with enough records at Inverness, LNER is the least punctual, at 79.2%.

LNER cancels fewer trains at Inverness than elsewhere: 0.7% of scheduled stops, against 2.9% across its network and 2.1% for every operator at the station.

LNER at Inverness has slipped a little, from 84.1% within three minutes in the previous 13 periods to 79.2% in the latest 13, a fall of 4.9 percentage points. Cancellations held steady at 0.7% of scheduled stops, against 0.3% before.

Alongside LNER, the other operators at Inverness are ScotRail (87.3%, 95% of stops) and Caledonian Sleeper (–, 2% of stops), so passengers here can compare several services.

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 89.3%Period 13 of 2023-24: 87.5%Period 4 of 2024-25: 88.7%Period 8 of 2024-25: 75.0%Period 12 of 2024-25: 91.1%Period 13 of 2024-25: 86.7%Period 2 of 2025-26: 85.7%Period 3 of 2025-26: 83.9%Period 4 of 2025-26: 75.0%Period 6 of 2025-26: 90.9%Period 12 of 2025-26: 83.6%Period 13 of 2025-26: 88.7%Period 1 of 2026-27: 81.7%Period 2 of 2026-27: 76.8%Period 3 of 2026-27: 80.4%Period 4 of 2026-27: 69.6%Period 6 of 2026-27: 73.2%Period 7 of 2026-27: 78.6%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.8%Period 13 of 2023-24: 1.8%Period 4 of 2024-25: 5.4%Period 8 of 2024-25: 0.0%Period 12 of 2024-25: 0.0%Period 13 of 2024-25: 0.0%Period 2 of 2025-26: 0.0%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 0.0%Period 6 of 2025-26: 1.8%Period 12 of 2025-26: 1.8%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 3.2%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 0.0%Period 4 of 2026-27: 0.0%Period 6 of 2026-27: 0.0%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275678.6%0.0%
Period 6 of 2026-275673.2%0.0%
Period 5 of 2026-2755––
Period 4 of 2026-275669.6%0.0%
Period 3 of 2026-275680.4%0.0%
Period 2 of 2026-275676.8%0.0%
Period 1 of 2026-276281.7%3.2%
Period 13 of 2025-266288.7%0.0%
Period 12 of 2025-265683.6%1.8%
Period 11 of 2025-2653––
Period 10 of 2025-2646––
Period 9 of 2025-2655––
Period 8 of 2025-2641––

Other operators at Inverness

OperatorScheduled stopsWithin 3 minCancelled
ScotRail27,51587.3%2.1%
Caledonian Sleeper626––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out