ScotRail at Inverness
How this operator is doing here
ScotRail had 27,515 scheduled stops at Inverness in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 87.3% of recorded arrivals came within three minutes and 2.1% of stops were cancelled.
ScotRail trains at Inverness also serve Inverness Airport (11.7 km north-east, 85.5% on time, 2.3% cancelled), Beauly (14.7 km west, – on time, 2.9% cancelled), Muir of Ord (14.8 km west, 89.2% on time, 2.7% cancelled), Conon Bridge (15.8 km north-west, – on time, 2.8% cancelled), Dingwall (17.4 km north-west, 87.1% on time, 2.7% cancelled) and Invergordon (23.4 km north, 84.8% on time, 2.5% cancelled), which are the stations on its network closest to Inverness.
Within 30 km of here, ScotRail runs best at Muir of Ord, 14.8 km west (89.2%), and worst at Nairn, 23.7 km north-east (84.4%).
The busiest ScotRail station within 30 km of Inverness is Inverness Airport, 11.7 km north-east, with about 32 scheduled stops a day.
Of the 2 operators with enough records at Inverness, ScotRail is the most punctual, at 87.3%.
For ScotRail, Inverness is the 167th best of 312 ranked stations. Its 87.3% here is 0.6 percentage points below the 87.9% across the whole network.
ScotRail at Inverness has edged up: 87.3% of stops came within three minutes of the timetable in the latest 13 periods, 2.3 percentage points better than the 85.0% of the 13 before. Cancellations fell to 2.1% of scheduled stops from 3.1%, which is 1.0 percentage points fewer.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,111 | 81.9% | 2.7% |
| Period 6 of 2026-27 | 2,110 | 91.8% | 2.2% |
| Period 5 of 2026-27 | 2,114 | 88.7% | 2.5% |
| Period 4 of 2026-27 | 2,112 | 87.8% | 2.0% |
| Period 3 of 2026-27 | 2,060 | 89.5% | 1.7% |
| Period 2 of 2026-27 | 2,126 | 91.1% | 1.2% |
| Period 1 of 2026-27 | 2,465 | 91.5% | 2.0% |
| Period 13 of 2025-26 | 2,327 | 90.2% | 1.9% |
| Period 12 of 2025-26 | 2,135 | 91.5% | 1.7% |
| Period 11 of 2025-26 | 2,002 | 82.2% | 3.5% |
| Period 10 of 2025-26 | 1,818 | 85.5% | 2.8% |
| Period 9 of 2025-26 | 2,110 | 81.7% | 2.6% |
| Period 8 of 2025-26 | 2,025 | 79.0% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Inverness
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 710 | 79.2% | 0.7% |
| Caledonian Sleeper | 626 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out