Hayes and Harlington
HAYLondonManaged by Elizabeth line
How this station is performing
Hayes and Harlington had 130,302 scheduled stops to Period 7 of 2026-27, about 358 a day. 85.4% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
Hayes and Harlington opened on 2 May 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, West Drayton is the oldest (1838) and Heathrow Terminal 4 (Rail Station Only) the newest (1998), with Hayes and Harlington in between.
The nearest stations to Hayes and Harlington are Southall (2.9 km east), West Drayton (3.8 km west), Heathrow Terminals 2 and 3 (Rail Station Only) (4.2 km south-west), Heathrow Terminal 4 (Rail Station Only) (5.2 km south) and Hanwell (5.7 km east). 37 stations lie within 10 km in all. Of the five, Heathrow Terminal 4 (Rail Station Only) is the most punctual at 91.1% and West Drayton the least at 84.8%, with Hayes and Harlington on 85.4%.
Hayes and Harlington is named after Harlington, an area of London, but the station stands 2.2 km from its centre.
3 operators call at Hayes and Harlington: Elizabeth line (85.5%, 98% of stops), Great Western Railway (81.1%, 2% of stops) and Heathrow Express (–, 0% of stops). They are close together, with Elizabeth line leading on 85.5% and Great Western Railway trailing on 81.1%, a gap of 4.4 percentage points.
Compared with 3 stations of a similar size in London, Hayes and Harlington is the least punctual, at 85.4%. All of them are ahead, including Honor Oak Park (92.1%), Forest Hill (91.2%) and Brockley (92.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 127,738 | 85.5% | 4.8% |
| Great Western Railway | 2,563 | 81.1% | 3.5% |
| Heathrow Express | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Hayes and Harlington? Delay Repay
These operators call at Hayes and Harlington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,031 | 86.0% | 3.9% |
| Period 6 of 2026-27 | 9,343 | 85.4% | 4.6% |
| Period 5 of 2026-27 | 10,143 | 84.7% | 10.2% |
| Period 4 of 2026-27 | 10,077 | 88.1% | 3.1% |
| Period 3 of 2026-27 | 9,776 | 86.0% | 5.6% |
| Period 2 of 2026-27 | 10,032 | 87.2% | 5.0% |
| Period 1 of 2026-27 | 11,253 | 86.4% | 5.1% |
| Period 13 of 2025-26 | 10,862 | 87.1% | 2.4% |
| Period 12 of 2025-26 | 9,970 | 85.4% | 3.3% |
| Period 11 of 2025-26 | 9,940 | 86.2% | 6.1% |
| Period 10 of 2025-26 | 9,309 | 85.0% | 3.8% |
| Period 9 of 2025-26 | 9,727 | 81.2% | 3.9% |
| Period 8 of 2025-26 | 9,839 | 80.8% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Honor Oak Park | 130,242 | 92.1% | 3.7% |
| Forest Hill | 130,241 | 91.2% | 3.7% |
| Brockley | 130,240 | 92.5% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out