Elizabeth line had 127,738 scheduled stops at Hayes and Harlington in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 85.5% of recorded arrivals came within three minutes and 4.8% of stops were cancelled.
Elizabeth line trains at Hayes and Harlington also serve Southall (2.9 km east, 86.5% on time, 3.9% cancelled), West Drayton (3.8 km west, 84.9% on time, 4.1% cancelled), Heathrow Terminals 2 and 3 (Rail Station Only) (4.2 km south-west, 88.0% on time, 6.2% cancelled), Heathrow Terminal 4 (Rail Station Only) (5.2 km south, 91.1% on time, 5.2% cancelled), Hanwell (5.7 km east, 86.2% on time, 4.2% cancelled) and Heathrow Terminal 5 (Rail Station Only) (5.8 km south-west, 91.0% on time, 7.7% cancelled), which are the stations on its network closest to Hayes and Harlington.
Within 30 km of here, Elizabeth line runs best at Canary Wharf, 27.8 km east (93.9%), and worst at Ealing Broadway, 8.3 km east (82.9%).
The busiest Elizabeth line station within 30 km of Hayes and Harlington is London Paddington, 16.8 km east, with about 644 scheduled stops a day.
Of the 2 operators with enough records at Hayes and Harlington, Elizabeth line is the most punctual, at 85.5%.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,838 | 86.1% | 4.0% |
| Period 6 of 2026-27 | 9,148 | 85.6% | 4.7% |
| Period 5 of 2026-27 | 9,948 | 84.7% | 10.4% |
| Period 4 of 2026-27 | 9,881 | 88.3% | 3.0% |
| Period 3 of 2026-27 | 9,580 | 86.1% | 5.7% |
| Period 2 of 2026-27 | 9,836 | 87.4% | 5.0% |
| Period 1 of 2026-27 | 11,026 | 86.5% | 5.2% |
| Period 13 of 2025-26 | 10,649 | 87.1% | 2.5% |
| Period 12 of 2025-26 | 9,776 | 85.5% | 3.3% |
| Period 11 of 2025-26 | 9,746 | 86.2% | 6.2% |
| Period 10 of 2025-26 | 9,134 | 85.0% | 3.6% |
| Period 9 of 2025-26 | 9,532 | 81.3% | 4.0% |
| Period 8 of 2025-26 | 9,644 | 80.8% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hayes and Harlington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 2,563 | 81.1% | 3.5% |
| Heathrow Express | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out