Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Great Western Railway at Hayes and Harlington

All trains at Hayes and HarlingtonGreat Western Railway across BritainLondon

On time, last 13 periods81.1%Whole station: 85.4%
Cancelled3.5%Whole station: 4.7%
Scheduled stops2,563Of 130,302 at the station

How this operator is doing here

Great Western Railway had 2,563 scheduled stops at Hayes and Harlington in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 81.1% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.

Great Western Railway trains at Hayes and Harlington also serve Southall (2.9 km east, 82.5% on time, 3.6% cancelled), West Drayton (3.8 km west, 82.0% on time, 3.2% cancelled), Iver (6.1 km west, 80.0% on time, 1.8% cancelled), Drayton Green (6.3 km east, 96.2% on time, 4.3% cancelled), Castle Bar Park (6.5 km east, 96.8% on time, 4.3% cancelled) and South Greenford (6.7 km north-east, 97.3% on time, 4.3% cancelled), which are the stations on its network closest to Hayes and Harlington.

Within 30 km of here, Great Western Railway runs best at Windsor and Eton Central, 13.4 km west (99.0%), and worst at London Paddington, 16.8 km east (68.9%).

The busiest Great Western Railway station within 30 km of Hayes and Harlington is London Paddington, 16.8 km east, with about 363 scheduled stops a day.

Of the 2 operators with enough records at Hayes and Harlington, Great Western Railway is the least punctual, at 81.1%.

Great Western Railway at Hayes and Harlington has edged up: 81.1% of stops came within three minutes of the timetable in the latest 13 periods, 2.9 percentage points better than the 78.2% of the 13 before. Cancellations fell to 3.5% of scheduled stops from 4.1%, which is 0.6 percentage points fewer.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 80.1%Period 2 of 2023-24: 81.0%Period 3 of 2023-24: 79.3%Period 4 of 2023-24: 83.0%Period 5 of 2023-24: 76.8%Period 6 of 2023-24: 72.1%Period 7 of 2023-24: 85.6%Period 8 of 2023-24: 76.3%Period 9 of 2023-24: 73.1%Period 10 of 2023-24: 77.0%Period 11 of 2023-24: 79.8%Period 12 of 2023-24: 84.4%Period 13 of 2023-24: 82.2%Period 1 of 2024-25: 84.7%Period 2 of 2024-25: 64.5%Period 3 of 2024-25: 80.9%Period 4 of 2024-25: 78.6%Period 5 of 2024-25: 78.6%Period 6 of 2024-25: 75.7%Period 7 of 2024-25: 77.4%Period 8 of 2024-25: 75.3%Period 9 of 2024-25: 70.3%Period 10 of 2024-25: 79.8%Period 11 of 2024-25: 84.8%Period 12 of 2024-25: 83.1%Period 13 of 2024-25: 70.4%Period 1 of 2025-26: 76.7%Period 2 of 2025-26: 80.7%Period 3 of 2025-26: 74.9%Period 4 of 2025-26: 76.2%Period 5 of 2025-26: 83.9%Period 6 of 2025-26: 77.5%Period 7 of 2025-26: 81.4%Period 8 of 2025-26: 80.5%Period 9 of 2025-26: 74.7%Period 10 of 2025-26: 83.0%Period 11 of 2025-26: 87.7%Period 12 of 2025-26: 81.0%Period 13 of 2025-26: 86.1%Period 1 of 2026-27: 85.8%Period 2 of 2026-27: 77.5%Period 3 of 2026-27: 78.5%Period 4 of 2026-27: 77.0%Period 5 of 2026-27: 82.1%Period 6 of 2026-27: 74.3%Period 7 of 2026-27: 84.7%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.8%Period 2 of 2023-24: 3.9%Period 3 of 2023-24: 1.7%Period 4 of 2023-24: 6.6%Period 5 of 2023-24: 3.1%Period 6 of 2023-24: 1.6%Period 7 of 2023-24: 0.5%Period 8 of 2023-24: 1.0%Period 9 of 2023-24: 7.1%Period 10 of 2023-24: 4.1%Period 11 of 2023-24: 1.0%Period 12 of 2023-24: 1.1%Period 13 of 2023-24: 1.0%Period 1 of 2024-25: 1.6%Period 2 of 2024-25: 0.5%Period 3 of 2024-25: 1.0%Period 4 of 2024-25: 4.6%Period 5 of 2024-25: 2.0%Period 6 of 2024-25: 3.6%Period 7 of 2024-25: 0.5%Period 8 of 2024-25: 1.0%Period 9 of 2024-25: 5.2%Period 10 of 2024-25: 10.0%Period 11 of 2024-25: 1.5%Period 12 of 2024-25: 1.6%Period 13 of 2024-25: 7.9%Period 1 of 2025-26: 4.9%Period 2 of 2025-26: 2.0%Period 3 of 2025-26: 4.1%Period 4 of 2025-26: 3.6%Period 5 of 2025-26: 1.5%Period 6 of 2025-26: 3.1%Period 7 of 2025-26: 1.0%Period 8 of 2025-26: 2.6%Period 9 of 2025-26: 2.6%Period 10 of 2025-26: 12.6%Period 11 of 2025-26: 3.1%Period 12 of 2025-26: 5.2%Period 13 of 2025-26: 1.9%Period 1 of 2026-27: 0.9%Period 2 of 2026-27: 4.6%Period 3 of 2026-27: 2.6%Period 4 of 2026-27: 4.6%Period 5 of 2026-27: 2.6%Period 6 of 2026-27: 2.1%Period 7 of 2026-27: 2.1%2023-242024-252025-262026-27

See how Great Western Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2719384.7%2.1%
Period 6 of 2026-2719574.3%2.1%
Period 5 of 2026-2719582.1%2.6%
Period 4 of 2026-2719677.0%4.6%
Period 3 of 2026-2719678.5%2.6%
Period 2 of 2026-2719677.5%4.6%
Period 1 of 2026-2722785.8%0.9%
Period 13 of 2025-2621386.1%1.9%
Period 12 of 2025-2619481.0%5.2%
Period 11 of 2025-2619387.7%3.1%
Period 10 of 2025-2617583.0%12.6%
Period 9 of 2025-2619574.7%2.6%
Period 8 of 2025-2619580.5%2.6%

Time of year

70%75%80%85%90%P1: 80.7%1P2: 78.9%2P3: 78.4%3P4: 78.6%4P5: 80.4%5P6: 74.9%6P7: 82.2%7P8: 77.3%8P9: 72.7%9P10: 79.3%10P11: 84.1%11P12: 82.8%12P13: 79.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Hayes and Harlington

OperatorScheduled stopsWithin 3 minCancelled
Elizabeth line127,73885.5%4.8%
Heathrow Express1––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out