Brockley
BCYLondonManaged by London Overground
How this station is performing
Brockley had 130,240 scheduled stops to Period 7 of 2026-27, about 358 a day. 92.5% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Brockley opened on 6 March 1871, 155 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, New Cross Gate is the oldest (1839) and Crofton Park the newest (1892), with Brockley in between.
The nearest stations to Brockley are Crofton Park (1.1 km south), Nunhead (1.1 km west), St Johns (London) (1.2 km north-east), New Cross Gate (1.2 km north) and New Cross (1.4 km north). 129 stations lie within 10 km in all. At 92.5%, Brockley is more punctual than every one of them; the best of the five, St Johns (London), manages 91.9%.
Brockley is one of 3 stations named after an area of London called Brockley, home to about 17,156 people; this one stands 1.3 km from its centre.
2 operators call at Brockley: London Overground (92.1%, 79% of stops) and GTR (94.1%, 21% of stops). They are close together, with GTR leading on 94.1% and London Overground trailing on 92.1%, a gap of 2.0 percentage points.
Compared with 3 stations of a similar size in London, Brockley is the most punctual, at 92.5%. The comparison group includes Forest Hill (91.2%), Honor Oak Park (92.1%) and Sydenham (London) (91.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 103,371 | 92.1% | 3.7% |
| GTR | 26,869 | 94.1% | 3.7% |
Operators with their own page for this station are linked to it.
Late train at Brockley? Delay Repay
These operators call at Brockley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,103 | 91.1% | 3.1% |
| Period 6 of 2026-27 | 9,748 | 89.1% | 4.5% |
| Period 5 of 2026-27 | 9,684 | 89.4% | 9.1% |
| Period 4 of 2026-27 | 10,147 | 93.3% | 5.5% |
| Period 3 of 2026-27 | 10,117 | 93.1% | 3.1% |
| Period 2 of 2026-27 | 9,690 | 94.1% | 3.2% |
| Period 1 of 2026-27 | 11,512 | 93.5% | 3.3% |
| Period 13 of 2025-26 | 10,526 | 94.5% | 2.4% |
| Period 12 of 2025-26 | 9,926 | 93.7% | 3.7% |
| Period 11 of 2025-26 | 9,752 | 92.1% | 3.2% |
| Period 10 of 2025-26 | 9,517 | 94.4% | 1.9% |
| Period 9 of 2025-26 | 9,977 | 91.5% | 2.6% |
| Period 8 of 2025-26 | 9,541 | 92.0% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Forest Hill | 130,241 | 91.2% | 3.7% |
| Honor Oak Park | 130,242 | 92.1% | 3.7% |
| Sydenham (London) | 130,229 | 91.6% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out