Honor Oak Park
HPALondonManaged by London Overground
How this station is performing
Honor Oak Park had 130,242 scheduled stops to Period 7 of 2026-27, about 358 a day. 92.1% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Honor Oak Park opened on 1 April 1886, 140 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Forest Hill is the oldest (1839) and Catford the newest (1892), with Honor Oak Park in between.
The nearest stations to Honor Oak Park are Crofton Park (0.8 km north-east), Forest Hill (1.4 km south-west), Catford (1.5 km south-east), Catford Bridge (1.6 km south-east) and Brockley (1.6 km north). 120 stations lie within 10 km in all. Of the five, Catford Bridge is the most punctual at 93.1% and Catford the least at 90.8%, with Honor Oak Park on 92.1%.
Honor Oak Park is named after Honor Oak, an area of London, but the station stands 0.5 km from its centre.
2 operators call at Honor Oak Park: London Overground (92.1%, 79% of stops) and GTR (91.8%, 21% of stops). They are close together, with London Overground leading on 92.1% and GTR trailing on 91.8%, a gap of 0.3 percentage points.
1 of 3 stations of a similar size in London are more punctual than Honor Oak Park on 92.1%. The comparison group includes Forest Hill (91.2%), Brockley (92.5%) and Sydenham (London) (91.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 103,373 | 92.1% | 3.7% |
| GTR | 26,869 | 91.8% | 3.7% |
Operators with their own page for this station are linked to it.
Late train at Honor Oak Park? Delay Repay
These operators call at Honor Oak Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,103 | 91.2% | 3.1% |
| Period 6 of 2026-27 | 9,748 | 86.1% | 4.5% |
| Period 5 of 2026-27 | 9,684 | 86.7% | 9.1% |
| Period 4 of 2026-27 | 10,149 | 93.2% | 5.5% |
| Period 3 of 2026-27 | 10,117 | 93.3% | 3.1% |
| Period 2 of 2026-27 | 9,690 | 94.1% | 3.2% |
| Period 1 of 2026-27 | 11,512 | 93.6% | 3.3% |
| Period 13 of 2025-26 | 10,526 | 94.6% | 2.4% |
| Period 12 of 2025-26 | 9,926 | 93.7% | 3.7% |
| Period 11 of 2025-26 | 9,752 | 91.9% | 3.2% |
| Period 10 of 2025-26 | 9,517 | 94.1% | 1.9% |
| Period 9 of 2025-26 | 9,977 | 91.4% | 2.6% |
| Period 8 of 2025-26 | 9,541 | 92.0% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Forest Hill | 130,241 | 91.2% | 3.7% |
| Brockley | 130,240 | 92.5% | 3.7% |
| Sydenham (London) | 130,229 | 91.6% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out