GTR at Harrow and Wealdstone
How this operator is doing here
GTR had 11,844 scheduled stops at Harrow and Wealdstone in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 84.8% of recorded arrivals came within three minutes and 6.8% of stops were cancelled.
GTR trains at Harrow and Wealdstone also serve Wembley Central (5.2 km south-east, 86.3% on time, 6.6% cancelled), Mill Hill Broadway (6.4 km east, 70.4% on time, 6.6% cancelled), Hendon (6.8 km east, 75.8% on time, 7.4% cancelled), Elstree and Borehamwood (7.7 km north-east, 70.9% on time, 6.6% cancelled), Brent Cross West (7.9 km east, 74.0% on time, 7.1% cancelled) and Watford Junction (9.0 km north-west, 83.3% on time, 6.8% cancelled), which are the stations on its network closest to Harrow and Wealdstone.
Within 30 km of here, GTR runs best at Birkbeck, 28.5 km south-east (98.1%), and worst at Mill Hill Broadway, 6.4 km east (70.4%).
The busiest GTR station within 30 km of Harrow and Wealdstone is East Croydon, 29.3 km south-east, with about 813 scheduled stops a day.
GTR ranks 2nd of the 3 operators with enough records at Harrow and Wealdstone, on 84.8%.
For GTR, Harrow and Wealdstone is the 130th best of 307 ranked stations. Its 84.8% here is 1.9 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 902 | 84.8% | 5.2% |
| Period 6 of 2026-27 | 1,001 | 84.3% | 1.9% |
| Period 5 of 2026-27 | 912 | 87.0% | 12.1% |
| Period 4 of 2026-27 | 993 | 83.2% | 7.2% |
| Period 3 of 2026-27 | 866 | 82.6% | 10.3% |
| Period 2 of 2026-27 | 954 | 83.1% | 12.9% |
| Period 1 of 2026-27 | 792 | 84.3% | 5.2% |
| Period 13 of 2025-26 | 1,076 | 88.4% | 4.3% |
| Period 12 of 2025-26 | 954 | 84.8% | 6.0% |
| Period 11 of 2025-26 | 822 | 84.2% | 4.6% |
| Period 10 of 2025-26 | 906 | 87.2% | 5.4% |
| Period 9 of 2025-26 | 886 | 83.3% | 6.1% |
| Period 8 of 2025-26 | 780 | 84.8% | 7.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Harrow and Wealdstone
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 86.7% | 2.9% |
| West Midlands Railway | 44,762 | 79.4% | 7.1% |
| Avanti | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out