London Overground at Harrow and Wealdstone
All trains at Harrow and WealdstoneLondon Overground across BritainLondon
How this operator is doing here
London Overground had 51,431 scheduled stops at Harrow and Wealdstone in the 13 periods to Period 7 of 2026-27, 48% of the station's total. 86.7% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
London Overground trains at Harrow and Wealdstone also serve Kenton (1.7 km south-east, 86.5% on time, 2.9% cancelled), Headstone Lane (1.9 km north-west, 87.4% on time, 3.3% cancelled), Hatch End (3.0 km north-west, 87.0% on time, 3.3% cancelled), South Kenton (3.1 km south-east, 88.1% on time, 2.9% cancelled), North Wembley (4.0 km south-east, 88.1% on time, 2.9% cancelled) and Wembley Central (5.2 km south-east, 90.2% on time, 2.9% cancelled), which are the stations on its network closest to Harrow and Wealdstone.
Within 30 km of here, London Overground runs best at Chingford, 24.2 km east (96.4%), and worst at Finchley Road and Frognal, 11.5 km south-east (75.2%).
The busiest London Overground station within 30 km of Harrow and Wealdstone is Highbury and Islington, 16.8 km east, with about 593 scheduled stops a day.
London Overground at Harrow and Wealdstone has slipped a little, from 90.7% within three minutes in the previous 13 periods to 86.7% in the latest 13, a fall of 4.0 percentage points. Cancellations rose to 2.9% of scheduled stops from 1.9%, which is 1.0 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 85.8% | 1.6% |
| Period 6 of 2026-27 | 3,879 | 85.2% | 5.1% |
| Period 5 of 2026-27 | 3,769 | 88.7% | 4.8% |
| Period 4 of 2026-27 | 4,051 | 81.7% | 2.7% |
| Period 3 of 2026-27 | 3,930 | 84.5% | 2.3% |
| Period 2 of 2026-27 | 3,901 | 88.5% | 3.6% |
| Period 1 of 2026-27 | 4,074 | 87.5% | 1.9% |
| Period 13 of 2025-26 | 4,356 | 89.1% | 1.5% |
| Period 12 of 2025-26 | 3,907 | 86.4% | 2.4% |
| Period 11 of 2025-26 | 4,032 | 86.5% | 2.7% |
| Period 10 of 2025-26 | 3,734 | 86.9% | 2.7% |
| Period 9 of 2025-26 | 3,764 | 86.1% | 4.0% |
| Period 8 of 2025-26 | 4,048 | 90.4% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Harrow and Wealdstone
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 44,762 | 79.4% | 7.1% |
| GTR | 11,844 | 84.8% | 6.8% |
| Avanti | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out