ScotRail had 223,595 scheduled stops at Edinburgh in the 13 periods to Period 7 of 2026-27, 81% of the station's total. 87.6% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
ScotRail trains at Edinburgh also serve Haymarket (2.0 km west, 86.7% on time, 1.4% cancelled), Slateford (4.3 km south-west, 86.8% on time, 1.3% cancelled), Brunstane (5.7 km east, 90.1% on time, 1.3% cancelled), Kingsknowe (5.9 km south-west, 80.8% on time, 1.3% cancelled), Newcraighall (6.6 km east, 89.9% on time, 1.3% cancelled) and South Gyle (7.0 km west, 82.3% on time, 1.4% cancelled), which are the stations on its network closest to Edinburgh.
Within 30 km of here, ScotRail runs best at Linlithgow, 25.4 km west (92.4%), and worst at Kinghorn, 13.1 km north (77.6%).
The busiest ScotRail station within 30 km of Edinburgh is Haymarket, 2.0 km west, with about 507 scheduled stops a day.
Of the 7 operators with enough records at Edinburgh, ScotRail is the most punctual, at 87.6%.
For ScotRail, Edinburgh ranks 162nd of 312 stations and is typical: 87.6% here against 87.9% across the network, a difference of 0.3 percentage points.
Cancellations of ScotRail at Edinburgh are near its usual level: 1.3% of scheduled stops, against 1.6% across its network and 1.6% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 16,816 | 86.4% | 0.9% |
| Period 6 of 2026-27 | 17,288 | 88.2% | 1.6% |
| Period 5 of 2026-27 | 17,428 | 86.0% | 1.2% |
| Period 4 of 2026-27 | 17,312 | 85.6% | 2.2% |
| Period 3 of 2026-27 | 17,354 | 88.4% | 1.2% |
| Period 2 of 2026-27 | 17,245 | 88.6% | 1.3% |
| Period 1 of 2026-27 | 19,875 | 89.5% | 1.2% |
| Period 13 of 2025-26 | 18,031 | 91.5% | 1.5% |
| Period 12 of 2025-26 | 17,274 | 90.2% | 1.1% |
| Period 11 of 2025-26 | 15,840 | 88.3% | 0.9% |
| Period 10 of 2025-26 | 14,959 | 87.0% | 1.1% |
| Period 9 of 2025-26 | 17,087 | 83.9% | 1.9% |
| Period 8 of 2025-26 | 17,086 | 85.0% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Edinburgh
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 22,157 | 72.5% | 2.4% |
| TransPennine Express | 11,018 | 78.5% | 2.6% |
| CrossCountry | 10,505 | 70.3% | 4.2% |
| Avanti | 4,687 | 66.3% | 4.4% |
| Lumo (East Coast) | 3,372 | 68.3% | 2.2% |
| Caledonian Sleeper | 649 | 69.9% | 2.3% |