LNER had 22,157 scheduled stops at Edinburgh in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 72.5% of recorded arrivals came within three minutes and 2.4% of stops were cancelled.
LNER trains at Edinburgh also serve Haymarket (2.0 km west, 51.2% on time, 1.3% cancelled), Inverkeithing (15.8 km north-west, 55.4% on time, 1.6% cancelled), Kirkcaldy (17.9 km north, 61.6% on time, 1.7% cancelled), Falkirk Grahamston (37.4 km west, 50.3% on time, 0.3% cancelled), Dunbar (42.4 km east, 75.9% on time, 1.4% cancelled) and Gleneagles (49.1 km north-west, 54.0% on time, 0.3% cancelled), which are the stations on its network closest to Edinburgh.
The busiest LNER station within 30 km of Edinburgh is Haymarket, 2.0 km west, with about 9 scheduled stops a day.
LNER ranks 3rd of the 7 operators with enough records at Edinburgh, on 72.5%.
For LNER, Edinburgh is the 11th best of 35 ranked stations. Its 72.5% here is 4.9 percentage points above the 67.6% across the whole network.
LNER at Edinburgh has slipped sharply. 72.5% of stops came within three minutes of the timetable in the latest 13 periods, 7.0 percentage points worse than the 79.5% recorded in the 13 before. Cancellations rose to 2.4% of scheduled stops from 1.7%, which is 0.7 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,588 | 71.6% | 1.2% |
| Period 6 of 2026-27 | 1,693 | 69.5% | 2.7% |
| Period 5 of 2026-27 | 1,718 | 66.0% | 2.6% |
| Period 4 of 2026-27 | 1,719 | 64.7% | 1.6% |
| Period 3 of 2026-27 | 1,730 | 70.4% | 2.2% |
| Period 2 of 2026-27 | 1,737 | 73.4% | 2.9% |
| Period 1 of 2026-27 | 1,964 | 69.4% | 3.1% |
| Period 13 of 2025-26 | 1,886 | 78.9% | 1.3% |
| Period 12 of 2025-26 | 1,715 | 77.2% | 2.7% |
| Period 11 of 2025-26 | 1,711 | 74.4% | 3.1% |
| Period 10 of 2025-26 | 1,529 | 74.4% | 2.8% |
| Period 9 of 2025-26 | 1,574 | 75.1% | 2.9% |
| Period 8 of 2025-26 | 1,593 | 77.6% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Edinburgh
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 223,595 | 87.6% | 1.3% |
| TransPennine Express | 11,018 | 78.5% | 2.6% |
| CrossCountry | 10,505 | 70.3% | 4.2% |
| Avanti | 4,687 | 66.3% | 4.4% |
| Lumo (East Coast) | 3,372 | 68.3% | 2.2% |
| Caledonian Sleeper | 649 | 69.9% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out